AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Nov 15 22:36:26 2025
Author
*
:
Subject
*
:
> NB: This list may be incomplete! > > CERN side: > > Beam operators hope for a FC which can be automated at the end of SEC: Olof ? > > Gain resistors (and other items) sent to CERN. Where are they? KJ has them? Check with Karl > > w26 PC needs to get online. Contact Olof when we return to ISOLDE to confirm the network port is still free. > Daid. Need to register the device to CERN > > Dry N2 bottle: ask Karl > > Edinburgh side: > > Iris automated controls and mounts: in construction. Add additional stop so doesnt close all the way. Peter > > Cooling line chamber feed through: get spare. Peter > > Get Al degrader foil for heavy ions (~13 um), mount on dummy frame etc. probably fine from store. Should get 15 > um for highest beam energy. With lowest beam energy we might need to change the foil: Daid > > Alpha spectral analysis: to be sorted. Daid, Claudia, Tom, Ruchi > > Sort routines for dE-E plots, etc, for online analysis: Tom > > Photo diodes x2 along with degrader foil: PCB for photodeiodes, PCB for photodiodes. extra holes for ladder. Peter > > Target ladder config finalization: 2 photodiodes, collimator (what size, we have 3 mm and 10mm), Beam viewer, > We need to verify how many positions we have. Need at least 2 CH2 and 1 Carbon. Daid, Claudia > > Extra ribbon cables are needed? need to check with calibration. Also need long ribbon cables > > Beam viewer: see target ladder > > Faraday cup SHV to SMA converter: Peter > > Window port for front of chamber? Peter > > Photographs and diagrams of experimental setup -- organized clearly for beam operators during tuning: add > technical drawing on elog. > > Alignment -- 2 end caps and one target ladder mount for optics reflector (8 mm diameter?) For survey people. Peter > > Adjustable feet to be produced for radial alignment: Peter / Toby > > Contact CERN about date for beam connection: As soon as possible after 20th October. Talk to Karl/Olof. > > Collimator at exit of SEC ? needs to be aligned. Ask what the other beamlines do - does olof have collimator > ahead of his chamber > > Calibration of Target ladder positions. Peter / Daid > > > Email to Karl & Olof about: > - FC after SEC > - Parcel of gain resistors > - date for connection of SEC to our chamber > - collimator in front of chamber ? > - N2 bottle
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898