AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE  ELOG logo
Message ID: 46     Entry time: Wed Nov 8 20:40:33 2017
Author: Daid, Ruchi 
Subject: Run 49 
Header: First test with RIB.  Irises closed.
End: End

~21:45
8 Nov 2017

Target #2: Position 127.95 mm; CH2_16: 450~480 ug/cm^2.

59Cu beam is on.  Nominal intensity was 6 x 10^5 pps.  5.0 MeV/u.

**Iris are all closed.**

Biases:  
dE: -33 V; 0.00 uA
E: -350 V; 1.99 uA
HI: -14 V; 0.86 uA
ELOG V3.1.4-unknown