AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Apr 3 19:29:11 2025
Author
*
:
Subject
*
:
Header: First run with irises open. 30 min run. Ender: Call from PS-Booster. Stop run. Date: 8 Nov 2017 Start: 21:46 Stop: 22:18 Target #2: Position 127.95 mm; CH2_16: 450~480 ug/cm^2. 59Cu beam is on. Nominal intensity was 6 x 10^5 pps. 5.0 MeV/u. **Iris are all open.** Biases (leak currents did not change opening the irises) dE: -33 V; 0.00 uA E: -350 V; 1.99 uA HI: -14 V; 0.86 uA Pulsers are in. Positive: 2 Hz, 1.4 V. Negative: Low freq, 1200 setting. Scalars 0 and 1 (see https://elog.ph.ed.ac.uk/ISOLDE/49 ) were in at the beginning of the run. Scalar 2 was added part way through. LEMO cables were not long enough to add 3 & 4 until after the run was stopped (swapped short cables for longer ones elsewhere.) Scalar 0 was showing a number of multiple hits. It was directly from the Fan In / Fan Out. At the end of the run, I switched it to the Lecroy 622 which has a larger width. We stopped because the PS-Booster called about cleaning one of the rings. (At first I misunderstood exactly what was going on or who called, but I stopped.)
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown