AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Tue Mar 14 10:57:20 2017
Author
*
:
Subject
*
:
<p>1) DAQ</p> <p>We have 192 channels to DAQ working. Mirco will test the silicon detectors with an alpha source in the next 2 weeks. </p> <p>2) Vacuum</p> <p>In the moment we reach 6E-6. There are still 2 tiny leaks. There will be an extra turbo for the upstream beam line which should improve the vacuum for ISOLDE purposes. <br /> We need to check how fast we can pump down as might need to open the chamber between tuning and beam time (detectors need to be protected from tune beam).</p> <p>3) Alignment</p> <p>Alignment of the sample positions can be done here (Mirco/Peter). Claudia will contact Karl about a survey team for alignment at ISOLDE. Then we can talk to them directly.</p> <p>4) Shipping</p> <p>We aim to ship the setup to CERN by the end of March. We will try to go over to CERN for initial setup middle of April (to be confirmed with Karl)</p> <p>5) Equipment needed from CERN</p> <p>Claudia will ask Karl about availability of a CAMAC crate and 2 NIM bins. </p> <p>6) Safety</p> <p>Peter will order safety boots and hard hats. <br /> Those who do not have ISOLDE access need to attend the ISOLDE radiation protection course. </p> <p>7) Availability for Preparations</p> <p>Tom not here: 25 March - 3 April, 25 April - middle June<br /> Daid not here: until middle June ?</p> <p>8) Samples CH2, CD2</p> <p>Paul has new batch and should send alpha spectra soon.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown