AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Apr 3 19:29:14 2025
Author
*
:
Subject
*
:
Header: Restart 5.0 MeV/u CH2 with 3 PS rings. Ender: Stop run. We want good data with a smaller file size for fast analysis, as well as to get on a 2 hour schedule. ==================================================== Run number : 51 Date : 8 Nov 2017 Start time : 22:44 Stop time : 00:04 Trigger rate (MIDAS) : 2192 Blocks written : 20460 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 Beam energy : 5.0 MeV/u Beam intensity : (was 6 x 10^5, but we have only 3 /4 PS-Booster rings) Target : #2 CH2_16 Ladder position : 127.95 Degrader foil (um) : 15 um Al 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 del_E voltage (V) : -33 del_E leakage (uA) : 0.00 E voltage (V) : -350 E leakage (uA) : 1.87 E_hi voltage (V) : -14 E_hi leakage (uA) : 0.83 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 Pressure (IMG1) : 8.25 x 10^-6 mbar Pressure (old gauge) : 2.6 x 10^-5 mbar Pressure (SEC) : 4.3 x 10^-6 mbar 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 Temp (Chiller) : -9.8 Temp (chamber) : +6.0 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 Comments: Only 3 out of 4 rings at PS-Booster for now (We stopped slightly from miscommunication.) 23:34: PS-Booster calls. Trying to add Ring 1 back. By 23:36 we can see all four rings. (In one supercycle, all rings drop.) ====================================================
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown