AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sun Nov 16 01:17:12 2025
Author
*
:
Subject
*
:
> Header: Restart 5.0 MeV/u CH2 with 3 PS rings. > Ender: Stop run. We want good data with a smaller file size for fast analysis, as well as to get on a 2 hour schedule. > ==================================================== > Run number : 51 > Date : 8 Nov 2017 > Start time : 22:44 > Stop time : 00:04 > Trigger rate (MIDAS) : 2192 > Blocks written : 20460 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Beam energy : 5.0 MeV/u > Beam intensity : (was 6 x 10^5, but we have only 3 /4 PS-Booster rings) > Target : #2 CH2_16 > Ladder position : 127.95 > Degrader foil (um) : 15 um Al > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > del_E voltage (V) : -33 > del_E leakage (uA) : 0.00 > E voltage (V) : -350 > E leakage (uA) : 1.87 > E_hi voltage (V) : -14 > E_hi leakage (uA) : 0.83 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Pressure (IMG1) : 8.25 x 10^-6 mbar > Pressure (old gauge) : 2.6 x 10^-5 mbar > Pressure (SEC) : 4.3 x 10^-6 mbar > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Temp (Chiller) : -9.8 > Temp (chamber) : +6.0 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Comments: Only 3 out of 4 rings at PS-Booster for now > (We stopped slightly from miscommunication.) > 23:34: PS-Booster calls. Trying to add Ring 1 back. By 23:36 we can see all four rings. (In one supercycle, all rings drop.) > ====================================================
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898