(Junk -- see comments)
====================================================
Run number : 52
Date : 9 Nov 2017
Start time :
Stop time :
Trigger rate (MIDAS) :
Blocks written :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy :
Beam intensity :
Target :
Ladder position :
Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) :
del_E leakage (uA) :
E voltage (V) :
E leakage (uA) :
E_hi voltage (V) :
E_hi leakage (uA) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) :
Pressure (old gauge) :
Pressure (SEC) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) :
Temp (chamber) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: 2 minutes after run starts, PS-Booster calls. They will go back to 3 rings, giving us the beam back in ten minutes
==================================================== |