AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Apr 3 19:29:09 2025
Author
*
:
Subject
*
:
Header: Restart 5.0 MeV/u w/ CH2 after PS comes back (3 rings until the morning) Ender: End ==================================================== Run number : 53 Date : 9 Nov 2017 Start time : 00:13:50 Stop time : 02:23:31 Trigger rate (MIDAS) : 2193 Blocks written : 31000 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 Beam energy : 5.0 MeV/u Beam intensity : < 6 x 10^5 pps Target : #2 CH2_16 (450~480 ug/cm^2) Ladder position : 127.95 Degrader foil (um) : 15 um Al 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 del_E voltage (V) : -32.5 V del_E leakage (uA) : 0.005 uA E voltage (V) : -350 V E leakage (uA) : 1.82 uA E_hi voltage (V) : -14 V E_hi leakage (uA) : 0.82 uA 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 PA power (upstream, positive) : 1.55 A PA power (upstream, negative) : 0.55 A PA power (downstream, positive) : 0.8 A PA power (downstream, negative) : 0.3 A 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 Pressure (IMG1) : 8.05 x 10^-6 mbar Pressure (old gauge) : 2.5 x 10^-5 mbar Pressure (SEC) : 4.2 x 10^-6 mbar 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 Temp (Chiller) : -10.0 Temp (chamber) : +5.5 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 Comments: ====================================================
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown