AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Aug 18 11:10:34 2025
Author
*
:
Subject
*
:
> Header: Continue with 5.0 MeV/u and CH2 > Ender: Checked control room, about 2:40. Target current is 2 A (low...should be 430 A). No beam seen at our FC, although MIDAS seemed to have events. > NB: You can monitor the target current on any network computer via: https://op-webtools.web.cern.ch/Vistar/vistars.php?usr=GPS > ==================================================== > Run number : 54 > Date : 9 Nov 2017 > Start time : 02:24:23 > Stop time : 03:02 > Trigger rate (MIDAS) : 2181 > Blocks written : 8749 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Beam energy : 5.0 MeV/u > Beam intensity : > Target : #2 CH2_16 ( 450 ~ 480 ug/cm^2) > Ladder position : 127.95 mm > HI Degrader foil (um) : 15 um Al > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > del_E voltage (V) : -32 V > del_E leakage (uA) : 0.015 uA > E voltage (V) : -350 V > E leakage (uA) : 1.77 uA > E_hi voltage (V) : -14 V > E_hi leakage (uA) : 0.82 uA > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > PA power (upstream, positive) : 1.55 A > PA power (upstream, negative) : 0.55 A > PA power (downstream, positive) : 0.8 A > PA power (downstream, negative) : 0.3 A > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Pressure (IMG1) : 7.75 x 10^-6 mbar > Pressure (old gauge) : 2.5 x 10^-5 mbar > Pressure (SEC) : 4.1 x 10^-6 mbar > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Temp (Chiller) : -10.1 deg > Temp (chamber) : 5.5 deg > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Comments: > ====================================================
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown