AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Apr 3 19:29:09 2025
Author
*
:
Subject
*
:
Header: Continue with 5.0 MeV/u and CH2. Laser back on. Ender: ==================================================== Run number : 57 Date : 9 / 11 Start time : 06:55 Stop time : Trigger rate (MIDAS) : 2078 Blocks written : 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 Beam energy : 5.0 MeV/u Beam intensity : 1.5 to 2.0 epA Target : #2 CH2 Ladder position : 127.95 mm HI Degrader foil (um) : 15 um Al 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 del_E voltage (V) : -32.0 V del_E leakage (uA) : 0.025 uA E voltage (V) : -350 V E leakage (uA) : 1.735 uA E_hi voltage (V) : -14 V E_hi leakage (uA) : 0.825 uA 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 PA power (upstream, positive) : 1.55 A PA power (upstream, negative) : 0.55 A PA power (downstream, positive) : 0.8 A PA power (downstream, negative) : 0.28 A 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 Pressure (IMG1) : 7.4 x 10^-6 mbar Pressure (old gauge) : 2.2 x 10^-5 mbar Pressure (SEC) : 3.9 x 10^-6 mbar 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 Temp (Chiller) : -10.0 deg Temp (chamber) : 5.5 deg 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 Comments: ====================================================
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown