Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (p+n E OR p+n HI (with 2^8 prescaler))
Ender:
====================================================
Run number : 66
Date : 9 / 11
Start time : 18:09
Stop time : 18:30
Trigger rate (MIDAS) :
Blocks written : 84
——————————————————————————————
Run Scalars
0- Ungated : 14
1- Gated : 12
2- dE : 51
3- E : 11
4- HI : 672
5- Pulser : 2
6- 1kHz Clock : 967
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.0 x 10^-6 mbar
Pressure (old gauge) : 2.0 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.2 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments: Beam stopped short because the beam went off from PBS towards the end.
==================================================== |