Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 72
Date : 09/11
Start time : 20:14
Stop time : 21:41
Trigger rate (MIDAS) :
Blocks written : 570
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 12
1- Gated : 10
2- dE : 59
3- E : 8
4- HI : 672
5- Pulser : 2
6- Clock : 967
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.7pA
Target : #6 CH2_33+35
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : 32
del_E leakage (uA) : 0.75
E voltage (V) : 350
E leakage (uA) : 1.73
E_hi voltage (V) : 14
E_hi leakage (uA) : 0.85
——————————————————————————————
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
——————————————————————————————
Pressure (IMG1) : 7.0E-06
Pressure (old gauge) : 2.0E-05
Pressure (SEC) : 3.9E-06
——————————————————————————————
Temp (Chiller) : -10
Temp (chamber) : 5.4
——————————————————————————————
Comments:
TDCs now in common stop mode, previously in normal mode. Now working correctly.
==================================================== |