AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Nov 9 21:31:16 2017
Author
*
:
Subject
*
:
<pre> Header: 4.7 MeV/u and CH2_30+25. Ender: STOP due to PSB fire. ==================================================== Run number : 74 Date : 09/11 Start time : 22:33 Stop time : 23:42 Trigger rate (MIDAS) : Blocks written : 422 —————————————————————————————— Run Scalars (approx rates) 0- Ungated : 1- Gated : 2- dE : 3- E : 4- HI : 5- Pulser : 6- Clock : —————————————————————————————— Beam energy : 4.7 MeV/u Beam intensity : 1.5pA Target : #6 CH2_33+35 Ladder position : 67.26 HI Degrader foil (um) : 15 um Al —————————————————————————————— del_E voltage (V) : 32 del_E leakage (uA) : 0.75 E voltage (V) : 350 E leakage (uA) : 1.73 E_hi voltage (V) : 14 E_hi leakage (uA) : 0.85 —————————————————————————————— PA power (upstream, positive) : 1.55A PA power (upstream, negative) : 0.55A PA power (downstream, positive) : 0.8A PA power (downstream, negative) : 0.28A —————————————————————————————— Pressure (IMG1) : 7.0E-06 Pressure (old gauge) : 2.0E-05 Pressure (SEC) : 3.9E-06 —————————————————————————————— Temp (Chiller) : -10 Temp (chamber) : 5.4 —————————————————————————————— Comments: ISOLDE: (PSB is 1 ring down - CCC operator to return 1st ring when fixed) Fluctuations in intensity throughout run, as operator attempts to restart. Final decision made to run with 3 rings and more runs per supercycle at 23:10. ====================================================</pre>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Screen_Shot_2017-11-09_at_22.35.20.png
Original size: 889x635
Attachment 2:
Screen_Shot_2017-11-09_at_22.38.49.png
Original size: 860x620
Attachment 3:
Screen_Shot_2017-11-10_at_13.54.40.png
Original size: 1280x800
Attachment 4:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown