AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE  ELOG logo
Message ID: 78     Entry time: Thu Nov 9 23:10:38 2017
Author: MD 
Subject: preparation for Carbon C_09 (Run 75) 
10/11/17: 00:03

switch target ladder to Pos #5: 82.44 mm

Carbon foil C_09 in place
(similar thickness as CH2_30+25, as used before)

Ready for beam coming back.
ELOG V3.1.4-unknown