AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Jan 1 02:32:35 2026
Author
*
:
Subject
*
:
> Header: 4.7 MeV/u and C_09. PS back, but need to check how much beam actually there was before next issue > Ender: no beam at our sample; IHS cavity (part of normal conducting linac) tripped > ==================================================== > Run number : 75 > Date : 10/11 > Start time : 02:20:11 > Stop time : 02:41:21 > Trigger rate (MIDAS) : > Blocks written : 77 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Run Scalars (approx rates) > 0- Ungated : 2 > 1- Gated : 2 > 2- dE : 7 > 3- E : 2 > 4- HI : 2 > 5- Pulser : 967 > 6- Clock : 0 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Beam energy : 4.7 MeV/u > Beam intensity : 2.0-2.5 pA (in the beginning) > Target : C_09 (Pos #5 - 82.44mm), chosen due to similar thickness as CH2_30+25, as used before > Ladder position : 82.44 > HI Degrader foil (um) : 15 um Al > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > del_E voltage (V) : -32 > del_E leakage (uA) : 0.8 > E voltage (V) : -350 > E leakage (uA) : 1.75 > E_hi voltage (V) : -14 > E_hi leakage (uA) : 0.88 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > PA power (upstream, positive) : 1.55A > PA power (upstream, negative) : 0.55A > PA power (downstream, positive) : 0.8A > PA power (downstream, negative) : 0.28A > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Pressure (IMG1) : 6.8E-06 > Pressure (old gauge) : 1.9E-05 > Pressure (SEC) : 3.8E-06 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Temp (Chiller) : -10.1 > Temp (chamber) : 5.4 (from before) > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Comments: realised no beam on target after couple of minutes: normal conducting cavity tripped > Alex and Daid try to fix it. > > ====================================================
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898