AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Dec 6 06:04:12 2025
Author
*
:
Subject
*
:
> > Header: 4.7 MeV/u and CH2_30+25. > Ender: beam stop at PS (6 hour interruption) > ==================================================== > Run number : 80 > Date : 10/11 > Start time : 08:00:49 > Stop time : 08:35:05 > Trigger rate (MIDAS) : 8 > Blocks written : 202 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Run Scalars (approx rates) > 0- Ungated : 9 > 1- Gated : 8 > 2- dE : 42 > 3- E : 8 > 4- HI : 482 > 5- Pulser : 2 > 6- Clock : 967 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Beam energy : 4.7 MeV/u > Beam intensity : not checked this run (should be around 1.5pA) > Target : CH2_30+25 (Pos#6; 490-520 ug/cm2) > Ladder position : 67.26 > HI Degrader foil (um) : 15 um Al > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > del_E voltage (V) : -32 > del_E leakage (uA) : 0.8 > E voltage (V) : -350 > E leakage (uA) : 1.745 > E_hi voltage (V) : -13.5 to -14 > E_hi leakage (uA) : 0.905 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > PA power (upstream, positive) : 1.55 A > PA power (upstream, negative) : -0.55 A > PA power (downstream, positive) : 0.8 A > PA power (downstream, negative) : -0.28 A > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Pressure (IMG1) : 6.75E-06 > Pressure (old gauge) : 1.9E-05 > Pressure (SEC) : 3.9E-06 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Temp (Chiller) : -10.0 > Temp (chamber) : 5.5 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Comments: > - since 6:20 RF problem on ring2 (although 3 full inj are shown) : ~1.6E+14 protons only > - 8.21 comment on PS: 6 hours of no beam > - 08:35 stop run, because no beam > > > ====================================================
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898