Header: 3.99 MeV/u and CH2_30+25.
Ender: Stopped to check E hardware.
====================================================
Run number : 81
Date : 10/11
Start time : 20:20
Stop time : 20:50
Trigger rate (MIDAS) :
Blocks written : 70
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 0
1- Gated : 0
2- dE : 12k
3- E : 92
4- HI : 50
5- Pulser : 2
6- Clock : 970
——————————————————————————————
Beam energy : 3.99 MeV/u
Beam intensity : 1.8 pA
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position : 67.26
HI Degrader foil (um) : 10 um Al
——————————————————————————————
del_E voltage (V) : -40
del_E leakage (uA) : 0.6
E voltage (V) : -350
E leakage (uA) : 2.17
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.325
——————————————————————————————
PA power (upstream, positive) : 1.55 mA
PA power (upstream, negative) : -0.55 mA
PA power (downstream, positive) : 0.8 mA
PA power (downstream, negative) : -0.28 mA
——————————————————————————————
Pressure (IMG1) : 1.0E-05 mbar
Pressure (old gauge) : 3.8E-05 mbar
Pressure (SEC) : 5.4E-06 mbar
——————————————————————————————
Temp (Chiller) : -9.9 degrees C
Temp (chamber) : 5.5 degrees C
——————————————————————————————
Comments:
==================================================== |