AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  K40  ELOG logo
Entry  Thu Jun 20 12:41:22 2024, CLW, To Prepare 
This is a draft message, edit and submit it to make it permanent  
Message ID: 28     Entry time: Mon Apr 6 01:31:52 2026     In reply to: 2
Author: CLW 
Subject: To Prepare 

 

Quote:

- new Kapton windows for chamber (underway, waiting for workshop)

- LiF and B samples from Daresbury: under production, will be shipped directly to CERN

- shorter flat cable: will try again to make a proper flat cable that is shorter. check with Tom

 

ELOG V3.1.3-7933898