AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  K40, Page 2 of 2  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Fri Sep 13 08:43:13 2024, CLW, Cabling 



Detector
Bunker Signal
patch
panel
signal cable
ADC Card
name in daq


dE 0
71
220804
10
5348
DEED
1


dE 1
72
220805
11
5348
DEED 2


dE
Entry  Fri Sep 13 08:12:04 2024, CLW, How to Edinburgh Chamber HOW_TO.docx
A how to from last year, still relevant for this measurement (only the vacuum valve may have moved depending on the pump.
Entry  Tue Aug 27 09:01:01 2024, CLW, Prep Meeting Slides K40_prepmeeting.pptx
 
Entry  Wed Jul 31 11:15:09 2024, CLW, Francisco, reference samples, 10B, LiF, blank Experiment_40K_Reference_Samples_1.jpegExperiment_40K_Reference_Samples_2.jpegB_Sample_2_1.jpegLiF_Sample_1_1.jpeg
B10 and LiF samples have arrived at CERN.

There are 4 LiF sample, 4 Boron sample and one blank sample. All samples are attached to a square and are in good condition.
Entry  Thu Jun 20 12:41:22 2024, CLW, To Prepare 
- new Kapton windows for chamber (underway, waiting for workshop)

- LiF and B samples from Daresbury: under production, will be shipped directly to CERN

- shorter flat cable: will try again to make a proper flat cable that is shorter. check with Tom
Entry  Tue Apr 16 08:57:12 2024, CLW, New Elog tab for 40K experiment 
This is a new elog tab dedicated to the 40K(n,p) and (n,alpha) experiment. Things to be prepared before the run (start of run TBD):

- new almunised Kapton windows for chamber (Peter has ordered material)
ELOG V3.1.4-unknown