| <p>After the first weekend, we change the setup configuration. We removed the shadow cone, and we placed the chamber closer to the LiF target.</p>
<p>The voltage was increased upto 100V for both detectors, but there was a problem in DSSSD1. Therefore, The voltage was setup at 70V for DSSSD #1 and 100V for DSSSD #2.</p>
<p>The chamber was placed at 6.5 cm form the LiF target. That's mean that the sample is placed at 14.1 cm from the LiF target.</p>
<p> </p>
<p><span style="font-size:20px"><strong>IMPORTANT!!!</strong></span></p>
<p><span style="font-size:20px">The sample is toward detector DSSSD #2. So, the sample is placed at 2.5 cm from DSSSD #2 and 2.7 cm from DSSSD #1.</span></p>
<p><span style="font-size:20px">DSSSD #2 is the upstream detector and DSSSD #1 is the downstream detector.</span></p> |