AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
MONNET
MONNET
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Jan 29 16:16:46 2026
Author
*
:
Subject
*
:
<p>Here is a brief status update on the chamber setup.</p> <p>At the moment, we have all the main components required for the experiment related to the chamber:</p> <ul> <li> <p>Vacuum chamber</p> </li> <li> <p>2 × MSL type W DSSSDs</p> </li> <li> <p>2 × MSL type W1 preamplifier units</p> </li> <li> <p>Sample support, feedthrough, and short cables</p> </li> <li> <p>4 fans for the preamplifiers</p> </li> <li> <p>2 cases for the preamplifiers</p> </li> <li> <p>Samples: 2 NaCl, 1 Boron, 1 Lithium, 1 dummy, and 1 empty</p> </li> <li> <p>Bias voltage cables for the preamplifiers</p> </li> </ul> <p>Please find attached some photos showing the current setup.</p> <p>The only remaining item to be installed is the fans, which will be connected on Monday, February 2nd. We may also try installing the detectors soon; we have already tested the fit with a spare detector, and it fits well.</p> <p>Additionally, the distance from the center still needs to be measured so that we can precisely determine the sample position from outside the chamber. We will need to add a reference mark for this.</p> <p>Finally, if we decide to position the detectors further away from the beam, we will require longer bias voltage cables for the preamplifiers.</p> <p>Please let me know if you need any further information.</p> <div> <p> </p> </div>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Preamp_Modules.jpeg
Original size: 2040x1536
Attachment 2:
Chamber_In.jpeg
Original size: 1536x2040
Attachment 3:
From_Chamber.jpeg
Original size: 1536x2040
Attachment 4:
Voltage_Cable.jpeg
Original size: 1536x2040
Attachment 5:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898