AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  MONNET, Page 1 of 2  ELOG logo
Entry  Fri Mar 6 08:56:26 2026, FGI, SB, Run 65 Am_241_Source.jpeg
Entry  Fri Mar 6 08:55:16 2026, FGI, SB, Run 64 
Entry  Thu Mar 5 09:25:45 2026, FGI, SB, Run 63 
Entry  Thu Mar 5 09:24:21 2026, FGI, SB, Run62 
Entry  Thu Mar 5 09:22:58 2026, FGI, SB, Run 61 
Entry  Thu Mar 5 09:21:10 2026, FGI, SB, Run 60 
Entry  Wed Mar 4 11:00:57 2026, CLW, 35Cl(n,p) proton peak, run with 3 MeV neutrons over night Cl35_Proton_Peak.png
Entry  Tue Mar 3 15:28:37 2026, FGI, SB, CLW, Run 59 
Entry  Tue Mar 3 08:25:45 2026, FG,SB,CLW, Run 58 
Entry  Tue Mar 3 08:24:06 2026, FG,SB,CLW, Run 57 
Entry  Mon Mar 2 13:50:20 2026, FGI, TD, SB, CLW, Cabling 
Entry  Mon Mar 2 13:24:11 2026, FG,SB,CLW, Run 56 
Entry  Mon Mar 2 13:22:52 2026, FG,SB,CLW, Run 55  
Entry  Mon Mar 2 11:11:18 2026, FGI, TD, SB, CLW, Second configuration. DSSSD1_Voltage_New.jpegDSSSD2_Voltage_New.jpeg
Entry  Mon Mar 2 10:39:30 2026, SW, TD, SB, CLW, Detector SetUp. First Configuration 9x
Entry  Mon Mar 2 10:38:42 2026, CLW, detector voltage change before Run 55 
Entry  Mon Mar 2 09:47:13 2026, CLW, Clock Synchronisation Edinburgh PC , Geel monitor PC 
Entry  Mon Mar 2 09:43:05 2026, FG,SB,CLW,TD, Run 54 
Entry  Sat Feb 28 12:09:56 2026, TD, Offline analysis data file R52 8x
Entry  Sat Feb 28 09:20:14 2026, TD, MIDAS DAQ configuration 8x
ELOG V3.1.3-7933898