ID |
Date |
Author |
Subject |
Text |
 |
|
32
|
Fri Mar 6 08:56:26 2026 |
FGI, SB | Run 65 | Am-241 calibration source. Towards DSSSD
#2 (PreAmp B) upstream detector
Starting time: 08:41:21 |
| |
31
|
Fri Mar 6 08:55:16 2026 |
FGI, SB | Run 64 | LiF #7 sample in beam
Starting time: 15:11:10
Stop time : 08:14:22 |
| |
30
|
Thu Mar 5 09:25:45 2026 |
FGI, SB | Run 63 | LiF #8 sample in beam
Starting time: 08:34:15
Stop time : 14:53:02 |
| |
29
|
Thu Mar 5 09:24:21 2026 |
FGI, SB | Run62 | Gold + Mylar sample in beam
Starting time: 15:32:00
Stop time : 08:13:55 |
| |
28
|
Thu Mar 5 09:22:58 2026 |
FGI, SB | Run 61 | Boron-10 #3 sample in beam
Starting time: 08:49:16
Stop time : 15:07:34 |
| |
27
|
Thu Mar 5 09:21:10 2026 |
FGI, SB | Run 60 | NaCl #5 sample in beam
Starting time: 15:29:51
Stop time : 08:19:57 |
| |
26
|
Wed Mar 4 11:00:57 2026 |
CLW | 35Cl(n,p) proton peak, run with 3 MeV neutrons over night | Plot from Fran showing peak around expected
proton energy in both detectors. Top half
are strips of detector placed at 180degrees |
| |
25
|
Tue Mar 3 15:28:37 2026 |
FGI, SB, CLW | Run 59 | Before this run, we change the target for
the neutron source. We are using a Triton
target of ~200 ug/cm². |
| |
24
|
Tue Mar 3 08:25:45 2026 |
FG,SB,CLW | Run 58 |
start: 08:24:49, 3.3.2026
stop: 10:13:25
blocks:
3062
Flux monitor
Start: 09:20:43 |
| |
23
|
Tue Mar 3 08:24:06 2026 |
FG,SB,CLW | Run 57 | Start: 15:45:30, 2.3. 2026
Stop: 07:57:05 3.3. 2026
Blocks: 25524 |
| |
22
|
Mon Mar 2 13:50:20 2026 |
FGI, TD, SB, CLW | Cabling | The cables are plug in this way.
Cable 0 connected to Preamp A,
Positive output. (n+n side, toward the sample) |
| |
21
|
Mon Mar 2 13:24:11 2026 |
FG,SB,CLW | Run 56 |
start: 13:28:38, 2.3.2026
stop: 15:05:22,
2.3.2026
blocks: 2206
LiF
no. 7 in beam |
| |
20
|
Mon Mar 2 13:22:52 2026 |
FG,SB,CLW | Run 55 |
start: 10:14:0531 2.3.26
stop: 12:57:08
2.3.26
blocks: 3855
NaCl No. 4 |
| |
19
|
Mon Mar 2 11:11:18 2026 |
FGI, TD, SB, CLW | Second configuration. | After the first weekend, we change the
setup configuration. We removed the shadow
cone, and we placed the chamber closer to |
 | |
18
|
Mon Mar 2 10:39:30 2026 |
SW, TD, SB, CLW | Detector SetUp. First Configuration | The first sample on beam is the NaCl target
#4. The shado cone was placed between the
LiF target and the chamber. |
9x | |
17
|
Mon Mar 2 10:38:42 2026 |
CLW | detector voltage change before Run 55 | preamp B detector (DSSSD 2) on 100 V, DSSSD
1 still on 70 |
| |
16
|
Mon Mar 2 09:47:13 2026 |
CLW | Clock Synchronisation Edinburgh PC , Geel monitor PC | T=0: Edinburgh Time 9:39:00
T=1:40: Geel Time 10:37:00
|
| |
15
|
Mon Mar 2 09:43:05 2026 |
FG,SB,CLW,TD | Run 54 |
start: 09:36:05 2.3.26
stop: 09:43:49
2.3.26
blocks: 14
Cu rod taken
out, run in neutron beam with NaCl target. |
| |
14
|
Sat Feb 28 12:09:56 2026 |
TD | Offline analysis data file R52 |
Offline data analysis of data file R52
c. 1h 2.25MeV neutrons from 10uA p+ + 410ug/cm2 |
8x | |
13
|
Sat Feb 28 09:20:14 2026 |
TD | MIDAS DAQ configuration |
MIDAS DAQ configuration files
|
8x |
|