AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  MONNET, Page 1 of 2  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Fri Mar 6 08:56:26 2026, FGI, SB, Run 65 Am_241_Source.jpeg
Am-241 calibration source. Towards DSSSD #2 (PreAmp B) upstream detector

Starting time: 08:41:21

Stop time :
Entry  Fri Mar 6 08:55:16 2026, FGI, SB, Run 64 
LiF #7 sample in beam

Starting time: 15:11:10

Stop time : 08:14:22
Entry  Thu Mar 5 09:25:45 2026, FGI, SB, Run 63 
LiF #8 sample in beam

Starting time: 08:34:15

Stop time : 14:53:02
Entry  Thu Mar 5 09:24:21 2026, FGI, SB, Run62 
Gold + Mylar sample in beam

Starting time: 15:32:00

Stop time : 08:13:55
Entry  Thu Mar 5 09:22:58 2026, FGI, SB, Run 61 
Boron-10 #3 sample in beam

Starting time: 08:49:16

Stop time : 15:07:34
Entry  Thu Mar 5 09:21:10 2026, FGI, SB, Run 60 
NaCl #5 sample in beam

Starting time: 15:29:51

Stop time : 08:19:57
Entry  Wed Mar 4 11:00:57 2026, CLW, 35Cl(n,p) proton peak, run with 3 MeV neutrons over night Cl35_Proton_Peak.png
Plot from Fran showing peak around expected proton energy in both detectors. Top half are strips of detector placed at 180degrees wrt neutron beam, bottom
half 0 degrees. Hence, proton peak from bottom half should be at slightly higher energy. 

 
Entry  Tue Mar 3 15:28:37 2026, FGI, SB, CLW, Run 59 
Before this run, we change the target for the neutron source. We are using a Triton target of ~200 ug/cm².

Starting time: 11:14:32

Stop: 15:03:16.
Entry  Tue Mar 3 08:25:45 2026, FG,SB,CLW, Run 58 

start: 08:24:49, 3.3.2026
stop: 10:13:25
blocks: 3062

Flux monitor

Start: 09:20:43

Duration: 6531
Entry  Tue Mar 3 08:24:06 2026, FG,SB,CLW, Run 57 
Start: 15:45:30, 2.3. 2026

Stop: 07:57:05 3.3. 2026

Blocks: 25524
Entry  Mon Mar 2 13:50:20 2026, FGI, TD, SB, CLW, Cabling 
The cables are plug in this way.

Cable 0 connected to Preamp A, Positive output. (n+n side, toward the sample)

Cable 1 connected to Preamp A, Negative output. (p+n side, backward the sample)
Entry  Mon Mar 2 13:24:11 2026, FG,SB,CLW, Run 56 

start: 13:28:38, 2.3.2026
stop:  15:05:22, 2.3.2026
blocks:   2206

LiF no. 7 in beam
Entry  Mon Mar 2 13:22:52 2026, FG,SB,CLW, Run 55  

start: 10:14:0531 2.3.26
stop: 12:57:08 2.3.26
blocks: 3855

 

NaCl No. 4
Entry  Mon Mar 2 11:11:18 2026, FGI, TD, SB, CLW, Second configuration. DSSSD1_Voltage_New.jpegDSSSD2_Voltage_New.jpeg
After the first weekend, we change the setup configuration. We removed the shadow cone, and we placed the chamber closer to the LiF target.

The voltage was increased upto 100V for both detectors, but there was a problem in DSSSD1. Therefore, The voltage was setup at 70V for DSSSD
#1 and 100V for DSSSD #2.
Entry  Mon Mar 2 10:39:30 2026, SW, TD, SB, CLW, Detector SetUp. First Configuration 9x
The first sample on beam is the NaCl target #4. The shado cone was placed between the LiF target and the chamber.

The shadow cone was a cupper cilinder of 4cm diameter and 30 cm lenght, placed at 0.8 cm from the LiF target and 2.8 cm from the chamber. See
first figure 1.
Entry  Mon Mar 2 10:38:42 2026, CLW, detector voltage change before Run 55 
preamp B detector (DSSSD 2) on 100 V, DSSSD 1 still on 70
Entry  Mon Mar 2 09:47:13 2026, CLW, Clock Synchronisation Edinburgh PC , Geel monitor PC 
T=0: Edinburgh Time 9:39:00

T=1:40: Geel Time 10:37:00

 
Entry  Mon Mar 2 09:43:05 2026, FG,SB,CLW,TD, Run 54 

start: 09:36:05 2.3.26
stop: 09:43:49 2.3.26
blocks: 14

Cu rod taken out, run in neutron beam with NaCl target. Distance chamber to
target is 6.5 cm. Run stopped due to high trigger rate in channels 138,144. 
Entry  Sat Feb 28 12:09:56 2026, TD, Offline analysis data file R52 8x

Offline data analysis of data file R52 
c. 1h 2.25MeV neutrons from 10uA p+ + 410ug/cm2 LiF -> copper block -> sample #4 Mylar+NaCl+197Au 
Entry  Sat Feb 28 09:20:14 2026, TD, MIDAS DAQ configuration 8x

MIDAS DAQ configuration files
ELOG V3.1.3-7933898