AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  MONNET, Last 2 days  ELOG logo
ID Date Author Subject
  32   Fri Mar 6 08:56:26 2026 FGI, SBRun 65

Am-241 calibration source. Towards DSSSD #2 (PreAmp B) upstream detector

Starting time: 08:41:21

Stop time :

Blocks :

The activity of th source is 0.1 uCi

Attachment 1: Am_241_Source.jpeg
Am_241_Source.jpeg
  31   Fri Mar 6 08:55:16 2026 FGI, SBRun 64

LiF #7 sample in beam

Starting time: 15:11:10

Stop time : 08:14:22

Blocks : 138311

Flux monitor

Starting time : 16:07:05

Duration: 613911

IMPORTANT!!!

The clocks are not sincronize

ELOG V3.1.3-7933898