AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  MONNET, Last 4 days  ELOG logo
ID Date Author Subject Text Attachments
  32   Fri Mar 6 08:56:26 2026 FGI, SBRun 65Am-241 calibration source. Towards DSSSD
#2 (PreAmp B) upstream detector

Starting time: 08:41:21
 Am_241_Source.jpeg 
  31   Fri Mar 6 08:55:16 2026 FGI, SBRun 64LiF #7 sample in beam

Starting time: 15:11:10

Stop time : 08:14:22
  
  30   Thu Mar 5 09:25:45 2026 FGI, SBRun 63LiF #8 sample in beam

Starting time: 08:34:15

Stop time : 14:53:02
  
  29   Thu Mar 5 09:24:21 2026 FGI, SBRun62Gold + Mylar sample in beam

Starting time: 15:32:00

Stop time : 08:13:55
  
  28   Thu Mar 5 09:22:58 2026 FGI, SBRun 61Boron-10 #3 sample in beam

Starting time: 08:49:16

Stop time : 15:07:34
  
  27   Thu Mar 5 09:21:10 2026 FGI, SBRun 60NaCl #5 sample in beam

Starting time: 15:29:51

Stop time : 08:19:57
  
  26   Wed Mar 4 11:00:57 2026 CLW35Cl(n,p) proton peak, run with 3 MeV neutrons over nightPlot from Fran showing peak around expected
proton energy in both detectors. Top half
are strips of detector placed at 180degrees
 Cl35_Proton_Peak.png 
ELOG V3.1.3-7933898