AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nTOFCapture  ELOG logo
Message ID: 61     Entry time: Sat Mar 23 15:06:44 2024
Author: Nick 
Subject: Detector Setup - 28/29Si Campaign 2024 

Campaign started yesterday. C6D6s placed at 9 cm distance, angle 125 degrees w.r.t beamline.

Measured calibration sources: Cs137, Y88, AmBe, CmC. Measuring Si-nat over the weekend.

Detector          Voltage

    C6D6_D_1 1550          
    C6D6_E_2 1590          
    C6D6_H_3 1460          
    C6D6_L_4 1450

 

Attachment 1: 20240322_145150.JPG  2.463 MB  | Hide | Hide all
20240322_145150.JPG
Attachment 2: 20240322_144319.JPG  2.121 MB  | Hide | Hide all
20240322_144319.JPG
Attachment 3: 20240322_144309.JPG  3.041 MB  | Hide | Hide all
20240322_144309.JPG
Attachment 4: 20240322_144304.JPG  2.553 MB  | Hide | Hide all
20240322_144304.JPG
Attachment 5: 20240322_144251.JPG  2.338 MB  | Hide | Hide all
20240322_144251.JPG
Attachment 6: 20240322_144247.JPG  2.457 MB  | Hide | Hide all
20240322_144247.JPG
Attachment 7: 20240322_144243.JPG  2.462 MB  | Hide | Hide all
20240322_144243.JPG
Attachment 8: 20240322_144239.JPG  2.757 MB  | Hide | Hide all
20240322_144239.JPG
Attachment 9: 20240322_144234.JPG  1.879 MB  | Hide | Hide all
20240322_144234.JPG
ELOG V3.1.4-unknown