AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF  ELOG logo
Message ID: 10     Entry time: Fri Oct 16 16:11:41 2015
Author: Sarah Lonsdale 
Subject: 09/10/15 Photos of detectors (reversed dE wiring) and upper level frame for future set up, leakage current 

 Leakage before take down:
de 0.07 micro A
E 0.47 micro A

Attachment 1: 2015-10-09_09.16.16.jpg  1.236 MB  | Hide | Hide all
2015-10-09_09.16.16.jpg
Attachment 2: 2015-10-09_09.16.22.jpg  1.280 MB  | Hide | Hide all
2015-10-09_09.16.22.jpg
Attachment 3: 2015-10-09_09.29.23.jpg  1.581 MB  | Hide | Hide all
2015-10-09_09.29.23.jpg
Attachment 4: 2015-10-09_09.29.35.jpg  1.551 MB  | Hide | Hide all
2015-10-09_09.29.35.jpg
Attachment 5: 2015-10-09_09.30.02.jpg  1.539 MB  | Hide | Hide all
2015-10-09_09.30.02.jpg
ELOG V3.1.4-unknown