AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF  ELOG logo
Message ID: 12     Entry time: Thu Jul 28 16:00:43 2016
Author: Sarah 
Subject: List of to-dos 

Process alpha data
- Compare pulser width and alpha width to calibration spectra (shaping amp with 1us and gain 50x)
- Does photodiode data process OK or is it a problem with the oscillations?

Process LiF data
- Any pile up issues? Problems with gamma flash?

 

Online monitoring:
- Check leakage every few days, check lab temp.
- Check alpha peaks of 26Al contaminants - Gd, B.
 

ELOG V3.1.4-unknown