AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF  ELOG logo
Message ID: 36     Entry time: Sat Oct 8 11:56:49 2022
Author: Nikolay Sosnin 
Subject: Silicon Strips of Concern 

DEED 6 and 9 no signal throughout the campaign.

EFED 27 high oscillations in baseline throughout the campaign.

ELOG V3.1.4-unknown