AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF  ELOG logo
Message ID: 45     Entry time: Thu Aug 10 09:10:02 2023
Author: CLW 
Subject: Detector Setup Al26 Run 2023 

dE Detector: W1-20 3186-9 20 um

E Detector: W1-150 3458-4 144 um

Voltages and Leakage Currents:

dE: 6 V, 0.02 muA

E: 50 V, 0.05 muA

Attachment 1: 20230809_181749.jpg  3.311 MB  Uploaded Thu Aug 10 10:15:03 2023  | Hide | Hide all
20230809_181749.jpg
Attachment 2: 20230809_181758.jpg  3.361 MB  Uploaded Thu Aug 10 10:16:43 2023  | Hide | Hide all
20230809_181758.jpg
Attachment 3: 20230809_172545.jpg  2.223 MB  Uploaded Thu Aug 10 10:17:16 2023  | Hide | Hide all
20230809_172545.jpg
Attachment 4: 20230809_172442.jpg  2.394 MB  Uploaded Thu Aug 10 10:17:51 2023  | Hide | Hide all
20230809_172442.jpg
ELOG V3.1.4-unknown