AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF  ELOG logo
Message ID: 70     Entry time: Thu Sep 28 15:32:16 2023
Author: Emmanuel 
Subject: LiF sample in 

We switched from 10B target (number 1) to LiF target (number 3). We planned to take this measurement for one day.

Attachment 1: 20230928_154334.jpg  1.637 MB  Uploaded Thu Sep 28 16:32:56 2023  | Hide | Hide all
20230928_154334.jpg
Attachment 2: 20230928_155923.jpg  2.651 MB  Uploaded Thu Sep 28 16:33:32 2023  | Hide | Hide all
20230928_155923.jpg
Attachment 3: 20230926_115053.jpg  1.941 MB  Uploaded Thu Sep 28 16:33:58 2023  | Hide | Hide all
20230926_115053.jpg
Attachment 4: 20230928_155747.jpg  2.295 MB  Uploaded Thu Sep 28 16:34:56 2023  | Hide | Hide all
20230928_155747.jpg
ELOG V3.1.4-unknown