AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF  ELOG logo
Message ID: 97     Entry time: Mon Aug 4 16:44:06 2025
Author: Selin 
Subject: Boron-1 Consistency Check 

These are the consistency checks done for Boron-1 sample.

Attachment 1: B1-1-8.png  34 kB  Uploaded Mon Aug 4 17:44:37 2025  | Hide | Hide all
B1-1-8.png
Attachment 2: B1-9-16.png  33 kB  Uploaded Mon Aug 4 17:44:46 2025  | Hide | Hide all
B1-9-16.png
Attachment 3: B1-17-24.png  44 kB  Uploaded Mon Aug 4 17:44:53 2025  | Hide | Hide all
B1-17-24.png
Attachment 4: B1-25-32.png  19 kB  Uploaded Mon Aug 4 17:44:59 2025  | Hide | Hide all
B1-25-32.png
ELOG V3.1.4-unknown