AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 3 of 6  ELOG logo
Entry  Tue Aug 23 15:34:38 2016, Claudia, Leakage currents 23.08.16 

 E = 0.03uA
dE = 0.04uA
PHDI = 0.09uA

- Monitor PHDI - increasing slowly...

Entry  Wed Aug 17 15:10:05 2016, Sarah, Leakage currents 12.08.16 

 E = 0.03uA
dE = 0.04uA
PHDI = 0.06uA

- Monitor PHDI - increasing slowly...

Entry  Thu Aug 11 08:19:37 2016, Sarah, Leakage currents 10.8.16 

 At lunchtime (12.45)

E = 0.03 uA
dE  = 0.04 uA
PHDI = 0.06 uA

Entry  Fri Sep 9 10:01:18 2016, Sarah, Leakage currents 09.09.16 

EFED 0.04uA
DEED 0.05uA
PHDI 0.13uA

Entry  Tue Aug 9 15:57:52 2016, Sarah, Leakage currents 09.08.16 

 Morning - 9am

E= 0.03uA
dE= 0.04uA
PHDI= 0.06uA

 

Afternoon - 4.30pm

E=0.03uA
dE= 0.03uA
PHDI=0.05uA
 

Entry  Mon Aug 8 11:02:13 2016, Sarah, Leakage currents 08.08.16 

 E 0.03 uA
dE 0.04 uA
PHDI 0.05 uA

 

Boron target 1 towards PHDI and Boron target 3 towards dE-E.

Mylar target gluing in electronics lab.

Entry  Fri Sep 2 12:01:57 2016, Sarah, Leakage currents 02.09.16 

E 0.03
dE 0.05
PHDI 0.12


Check on PHDI pulser width:
205170 (first in beam run) - 1.1% FWHM (at 8275 ch)
205439 (01/09/16) - 1.0% FWHM (at 8008 ch)

Seems to be holding up OK at present.

Entry  Wed Aug 3 14:48:09 2016, Sarah, Leakage currents 02.08 - 03.08 

 02.08:

dE = 0.03 uA

E = 0.03 uA

PHDI = 0.04 uA

 

03.08:

dE = 0.03 uA

E 0.04 uA

PHDI = 0.04 uA

Entry  Thu Oct 6 09:28:33 2022, Claudia, Items to be replaced for next run 20221005_122654.pdf

Missing/broken items identified

- long rails for fixing chamber on support

- vacuum valve (ours is broken)

- at least 2 lemo - BNC converters

- short M3 screws (photo)

Entry  Thu May 26 09:20:32 2022, Nick / Claudia, Inventory of Items at n_TOF for (n,cp) experiments rn_image_picker_lib_temp_e85b2099-7b73-4246-843d-6351800c2709.jpgrn_image_picker_lib_temp_3ff5f819-1e0c-4278-bbbc-01038a0a0c94.jpg

Detectors currently in the boxes:

2x MSL type W1(SS)-50, 2902-4 (53um), 2940-6 (55um)

1x MSL type W1(SS)-20 2837-33 (20um)

1x MSL type W1(DS?) 1230-10  (500 or 300 um)

1x MSL type W1(DS)-500 1194-9 (494um)

 

Three aluminium crates contain 26Al(n, alpha) kit from EAR2, and was in the barracks (building 6547) near detector lab by EAR1 entrance. A list is attached and photos can be found on Dropbox:

https://www.dropbox.com/sh/68k1xove2zr1bmj/AADKvN8wR_Ia2EwZMOXZqdMCa?dl=0

Entry  Thu Aug 10 10:05:48 2023, CLW, Gafchromics Foil 20230809_165433.jpg20230810_085457.jpg20230809_165436.jpg

Gafchromics foil was mounted on empty brass frame back to back with Li sample

Neutron beam goes well through the sample. Centered ~1 cm from sample center. Conclusion: no changes needed (too risky to make it worse and it is ok now)

Entry  Wed Jul 27 13:20:53 2016, Sarah, Gafchromic images 6x
 
Entry  Mon Jun 23 09:36:32 2025, CLW, Expected Spectra for Li and B in a 50 um Si detector 50_um.png

B looks as we are used to , Li tritons are now stopped in the detector and should appear around 2.8 MeV. 

Entry  Mon Oct 2 08:53:06 2023, Emmanuel, Empty Frame Empty_Frame.jpeg

An empty frame (on the top) was placed on Friday night.

Entry  Wed Aug 3 09:48:31 2016, Sarah, EFED10 alpha calibration checks 

 

EFED10: (1 bin = 2 ch)

Pulser (DAQ):
- Centroid = 5396.8(6) ch
- FWHM = 41(1) ch = 0.7%
 

Pulser (Maestro):
- Centroid = 4042 ch
- FWHM = 82 ch = 1.9%
 

148Gd (DAQ):
- Centroid = 2215(1) ch
- FWHM = 57(9) ch = 2.6%

 

148Gd (Maestro):
- Centroid = 1722 ch
- FWHM = 30 ch = 1.7%

 
Entry  Fri Aug 11 16:50:58 2023, Nikolay Sosnin, EDET24 EDET24_Card.JPGEDET24_Cable.JPG

After inserting aluminium target, previously-dead channel 24 on EDET was re-plugged into a 12-bit card SPD02872. It is the only EDET on 12-bit card, the rest are on 14-bit. From pulsers, there appears to be a 90 ns offset from this EDET to others, with EDET24 preceeding the rest. The last channel on 14-bit cards was broken, hence havng to use 12-bit.

Entry  Thu Sep 12 15:26:30 2024, Nick, EAR2 Periodic Noise IMG_20240912_161937023_HDR.jpg
 
Entry  Fri Aug 11 13:16:56 2023, Nikolay Sosnin, E Front Incorrect Cabling 

E front 2x16-way to 1x34-way IDC cable from the Junction Box to the IDC-Lemo 00 adaptor was found to be inserted upside-down - the 16-way IDC connectors did not have polarisation keys - meaning the E detector p+n junction strip signals collected with 26Al for the first night are not working. Signals from the dE p+n junction strips and E n+n Ohmic strips will be OK. The mistake occurred at the conclusion of the noise tests yesterday - see https://elog.ph.ed.ac.uk/nToF/52

The 2x16-way to 1x34-way IDC cable without polarisation keys has now been replaced.

Run 216417 and onwards have correct cabling. For runs before that, E back and dE are still reliable.

Entry  Tue Sep 5 16:09:45 2023, Emmanuel, Drop in gain for DEED 14 alndeed14.pngalndeed14b.pngalndeed14old.png

Dear all,

There was an issue with one of the strips of the deltaE detector (DEED 14), for run216644. The gain dropped to almost a factor of 3. Find attached.

Somehow, it was fixed, but still lags, when compared to other strips of deltaE. This was tested for a more recent run, run216651. Find attached.

I also checked a bit older run (run216637) and they look similar.. Find attached. Maybe we should figure out if this will be a problem for the DEED14 strips.

 

NOTE: The plots have the run number at the top-center.

 

Emmanuel Odusina

 

 

Entry  Sun Oct 9 20:57:54 2022, Nikolay Sosnin, Detectors in-beam, no target 12x

After long beam-off, changed detector mount by moving it 2 cm forward into the beam, after removing LiF 3.

ELOG V3.1.3-7933898