|
ID |
Date |
Author |
Subject |
Text |
 |
|
20
|
Mon Aug 8 11:02:13 2016 |
Sarah | Leakage currents 08.08.16 | E 0.03 uA
dE 0.04 uA
PHDI 0.05 uA |
|
|
25
|
Fri Sep 2 12:01:57 2016 |
Sarah | Leakage currents 02.09.16 | E 0.03
dE 0.05
PHDI 0.12 |
|
|
19
|
Wed Aug 3 14:48:09 2016 |
Sarah | Leakage currents 02.08 - 03.08 | 02.08:
dE = 0.03 uA
E = 0.03 uA |
|
|
29
|
Thu Oct 6 09:28:33 2022 |
Claudia | Items to be replaced for next run | Missing/broken items identified
- long rails for fixing chamber
on support |
|
|
28
|
Thu May 26 09:20:32 2022 |
Nick / Claudia | Inventory of Items at n_TOF for (n,cp) experiments | Detectors currently in the boxes:
2x MSL type W1(SS)-50, 2902-4 (53um),
2940-6 (55um) |
 |
|
49
|
Thu Aug 10 10:05:48 2023 |
CLW | Gafchromics Foil | Gafchromics foil was mounted on empty brass
frame back to back with Li sample
Neutron beam goes well through |
  |
|
11
|
Wed Jul 27 13:20:53 2016 |
Sarah | Gafchromic images | |
6x |
|
84
|
Mon Jun 23 09:36:32 2025 |
CLW | Expected Spectra for Li and B in a 50 um Si detector | B looks as we are used to , Li tritons
are now stopped in the detector and should
appear around 2.8 MeV. |
|
|
71
|
Mon Oct 2 08:53:06 2023 |
Emmanuel | Empty Frame | An empty frame (on the top) was placed
on Friday night. |
|
|
18
|
Wed Aug 3 09:48:31 2016 |
Sarah | EFED10 alpha calibration checks |
|
|
|
60
|
Fri Aug 11 16:50:58 2023 |
Nikolay Sosnin | EDET24 | After inserting aluminium target, previously-dead
channel 24 on EDET was re-plugged into a
12-bit card SPD02872. It is the only EDET |
 |
|
78
|
Thu Sep 12 15:26:30 2024 |
Nick | EAR2 Periodic Noise | |
|
|
59
|
Fri Aug 11 13:16:56 2023 |
Nikolay Sosnin | E Front Incorrect Cabling | E front 2x16-way to 1x34-way IDC cable
from the Junction Box to the IDC-Lemo 00
adaptor was found to be inserted upside-down |
|
|
68
|
Tue Sep 5 16:09:45 2023 |
Emmanuel | Drop in gain for DEED 14 | Dear all,
There was an issue with one of
the strips of the deltaE detector (DEED 14), |
  |
|
38
|
Sun Oct 9 20:57:54 2022 |
Nikolay Sosnin | Detectors in-beam, no target | After long beam-off, changed detector mount
by moving it 2 cm forward into the beam,
after removing LiF 3. |
12x |
|
88
|
Sat Jul 12 11:34:31 2025 |
Selin | Detector-Cable Connections | List of the detectors and the connections. |
|
|
46
|
Thu Aug 10 09:20:37 2023 |
CLW | Detector Signal Cabling Al26 Aug 2023 |
delta
E detector Cabling
|
8x |
|
45
|
Thu Aug 10 09:10:02 2023 |
CLW | Detector Setup Al26 Run 2023 | dE Detector: W1-20 3186-9 20 um
E Detector: W1-150 3458-4 144 um
Voltages and Leakage Currents: |
   |
|
65
|
Thu Aug 17 10:26:51 2023 |
Nikolay Sosnin | Data Processing | To run raw2root on LXPLUS, you will need
to add the following line to your .bashrc,
performed using |
|
|
15
|
Sun Jul 31 15:02:57 2016 |
Sarah | DEED6 Alpha calibration checks (205168) | DEED6: (1 bin = 2 ch)
|
|