AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 3 of 5  ELOG logo
  ID Date Author Subjectdown Text Attachments
  20   Mon Aug 8 11:02:13 2016 SarahLeakage currents 08.08.16 E 0.03 uA
dE 0.04 uA
PHDI 0.05 uA
  
  25   Fri Sep 2 12:01:57 2016 SarahLeakage currents 02.09.16E 0.03
dE 0.05
PHDI 0.12
  
  19   Wed Aug 3 14:48:09 2016 SarahLeakage currents 02.08 - 03.08 02.08:
dE = 0.03 uA
E = 0.03 uA
  
  29   Thu Oct 6 09:28:33 2022 ClaudiaItems to be replaced for next runMissing/broken items identified

- long rails for fixing chamber
on support
 20221005_122654.pdf 
  28   Thu May 26 09:20:32 2022 Nick / ClaudiaInventory of Items at n_TOF for (n,cp) experimentsDetectors currently in the boxes:

2x MSL type W1(SS)-50, 2902-4 (53um),
2940-6 (55um)
 rn_image_picker_lib_temp_e85b2099-7b73-4246-843d-6351800c2709.jpgrn_image_picker_lib_temp_3ff5f819-1e0c-4278-bbbc-01038a0a0c94.jpg 
  49   Thu Aug 10 10:05:48 2023 CLWGafchromics FoilGafchromics foil was mounted on empty brass
frame back to back with Li sample

Neutron beam goes well through
 20230809_165433.jpg20230810_085457.jpg20230809_165436.jpg 
  11   Wed Jul 27 13:20:53 2016 SarahGafchromic images   6x 
  84   Mon Jun 23 09:36:32 2025 CLWExpected Spectra for Li and B in a 50 um Si detectorB looks as we are used to , Li tritons
are now stopped in the detector and should
appear around 2.8 MeV. 
 50_um.png 
  71   Mon Oct 2 08:53:06 2023 EmmanuelEmpty FrameAn empty frame (on the top) was placed
on Friday night.
 Empty_Frame.jpeg 
  18   Wed Aug 3 09:48:31 2016 SarahEFED10 alpha calibration checks 
  
  60   Fri Aug 11 16:50:58 2023 Nikolay SosninEDET24After inserting aluminium target, previously-dead
channel 24 on EDET was re-plugged into a
12-bit card SPD02872. It is the only EDET
 EDET24_Card.JPGEDET24_Cable.JPG 
  78   Thu Sep 12 15:26:30 2024 NickEAR2 Periodic Noise   IMG_20240912_161937023_HDR.jpg 
  59   Fri Aug 11 13:16:56 2023 Nikolay SosninE Front Incorrect CablingE front 2x16-way to 1x34-way IDC cable
from the Junction Box to the IDC-Lemo 00
adaptor was found to be inserted upside-down
  
  68   Tue Sep 5 16:09:45 2023 EmmanuelDrop in gain for DEED 14Dear all,

There was an issue with one of
the strips of the deltaE detector (DEED 14),
 alndeed14.pngalndeed14b.pngalndeed14old.png 
  38   Sun Oct 9 20:57:54 2022 Nikolay SosninDetectors in-beam, no targetAfter long beam-off, changed detector mount
by moving it 2 cm forward into the beam,
after removing LiF 3.
 12x 
  88   Sat Jul 12 11:34:31 2025 SelinDetector-Cable ConnectionsList of the detectors and the connections.  Detector-Cable.pdf 
  46   Thu Aug 10 09:20:37 2023 CLWDetector Signal Cabling Al26 Aug 2023
delta
E detector Cabling


 8x 
  45   Thu Aug 10 09:10:02 2023 CLWDetector Setup Al26 Run 2023dE Detector: W1-20 3186-9 20 um

E Detector: W1-150 3458-4 144 um

Voltages and Leakage Currents:
 20230809_181749.jpg20230809_181758.jpg20230809_172545.jpg20230809_172442.jpg 
  65   Thu Aug 17 10:26:51 2023 Nikolay SosninData ProcessingTo run raw2root on LXPLUS, you will need
to add the following line to your .bashrc,
performed using
  
  15   Sun Jul 31 15:02:57 2016 SarahDEED6 Alpha calibration checks (205168) DEED6: (1 bin = 2 ch)
  
ELOG V3.1.4-unknown