AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 3 of 4  ELOG logo
ID Date Author Subjectdown Text Attachments
  18   Wed Aug 3 09:48:31 2016 SarahEFED10 alpha calibration checks 
  
  60   Fri Aug 11 16:50:58 2023 Nikolay SosninEDET24After inserting aluminium target, previously-dead
channel 24 on EDET was re-plugged into a
12-bit card SPD02872. It is the only EDET
 EDET24_Card.JPGEDET24_Cable.JPG 
  78   Thu Sep 12 15:26:30 2024 NickEAR2 Periodic Noise   IMG_20240912_161937023_HDR.jpg 
  59   Fri Aug 11 13:16:56 2023 Nikolay SosninE Front Incorrect CablingE front 2x16-way to 1x34-way IDC cable
from the Junction Box to the IDC-Lemo 00
adaptor was found to be inserted upside-down
  
  68   Tue Sep 5 16:09:45 2023 EmmanuelDrop in gain for DEED 14Dear all,

There was an issue with one of
the strips of the deltaE detector (DEED 14),
 alndeed14.pngalndeed14b.pngalndeed14old.png 
  38   Sun Oct 9 20:57:54 2022 Nikolay SosninDetectors in-beam, no targetAfter long beam-off, changed detector mount
by moving it 2 cm forward into the beam,
after removing LiF 3.
 12x 
  46   Thu Aug 10 09:20:37 2023 CLWDetector Signal Cabling Al26 Aug 2023
delta
E detector Cabling


 8x 
  45   Thu Aug 10 09:10:02 2023 CLWDetector Setup Al26 Run 2023dE Detector: W1-20 3186-9 20 um

E Detector: W1-150 3458-4 144 um

Voltages and Leakage Currents:
 20230809_181749.jpg20230809_181758.jpg20230809_172545.jpg20230809_172442.jpg 
  65   Thu Aug 17 10:26:51 2023 Nikolay SosninData ProcessingTo run raw2root on LXPLUS, you will need
to add the following line to your .bashrc,
performed using
  
  15   Sun Jul 31 15:02:57 2016 SarahDEED6 Alpha calibration checks (205168) DEED6: (1 bin = 2 ch)
  
  16   Sun Jul 31 15:56:32 2016 SarahDEED16 Alpha calibration checks (205169)***note that DEED 16 was on old sampling
rate for 205168- so use next run, also DEED
9-12 not plugged in***
  
  14   Sun Jul 31 14:32:34 2016 SarahDEED1 Alpha calibration checks (205168) DEED1: (rebin x2 -> 1 bin = 4
ch)
Pulser (DAQ):
  
  31   Thu Oct 6 11:07:47 2022 Nikolay SosninChange of sample/Addition of pulserChanged from LiF 4 to LiF 3 after running
with LiF 4 overnight (run title on n_TOF
DAQ was not updated to refelect the change,
  
  35   Fri Oct 7 20:04:30 2022 Nikolay SosninChange of Pulser SettingThe pulser has been switched from triggering
from beam trigger to running at a 10 Hz rate,
and will now appear in random places in signal
  
  33   Thu Oct 6 14:58:29 2022 Nikolay SosninChange of Pulser DelayStill using pulser triggered from protons.
12 microsecond delay from protons to gamma-flash
+ 1.75 microsecond delay from gamma flash
  
  34   Fri Oct 7 17:17:08 2022 Nikolay SosninChange of Pulser DelayStill using pulser triggered from protons.
12 microsecond delay from protons to gamma-flash
+ 11 microsecond delay from gamma flash to
  
  37   Sat Oct 8 11:57:36 2022 Nikolay SosninChange of Detector-Target SeparationIncreased detector-target (LiF 3) separation
by 1.5 cm. Had to replace the support strut
under the detectors due to the previous one
 17x 
  41   Mon Jul 3 13:01:30 2023 EmmanuelBoxes for nTOF experiments to CERNBox 1

1. RC412 Cables

2. Screws and parts for rails
  
  40   Sun Oct 9 21:07:02 2022 Nikolay SosninBoron Sample 3 Measurement21:15 Changed from detectors in-beam to
boron-10 sample 3 in-beam (in-beam measurement
got 1000 triggers, 500 of which were dedicated).
 14x 
  82   Tue Mar 18 13:28:30 2025 EmmanuelB10 and LiF data with Fast Fourier TransformAttached is the B10 and LiF data with
Fast Fourier Transform and varying time
constants.
 B10.pdfLi.pdf 
ELOG V3.1.4-unknown