| |
ID |
Date |
Author |
Subject |
Text |
 |
|
|
105
|
Wed Sep 24 21:35:27 2025 |
Emmanuel | 26AL New processing routine with FFT | |
29x |
|
|
104
|
Thu Sep 18 14:11:29 2025 |
CLW, EO | New processing | Comparison strip 6 amplitude spectra anew
(red) vs (old) processing (Screenshot). Slight
shift in amplitude and slightly less counts |
 |
|
|
103
|
Tue Sep 9 13:59:29 2025 |
Selin | UserInputs for Processing | This is the UserINputs for the processing
of Ca41. The dead time used for the processing
has been 2us. Further processing of a B run |
|
|
|
102
|
Mon Aug 25 10:47:44 2025 |
Selin | Pulser Test - Week 1 and 2 | This is the pulser test between runs 221376
and 221377 (06/08/2025) which is in pink
and 221439 and 221440 (13/08/2025) which |
   |
|
|
101
|
Thu Aug 21 16:19:43 2025 |
Emmanuel | Checking DEED 11 with the Pulser | We checked DEED 11 with the Pulser and
it was still unresponsive (See screenshot).
Next, we will change the LEMO cables |
|
|
|
100
|
Mon Aug 18 09:19:27 2025 |
Emmanuel | DEED 11 NO Gamma Flash Signal | We observed that DEED11 no longer have
Gamma flash signals.
Before the drop, it had some weird |
    |
|
|
99
|
Wed Aug 6 11:20:52 2025 |
Selin | Pulser Test | The pulser test was performed with a frequency
of 500 Hz and with voltage settings of: 2V,
1.6V, 1.2V, 0.8V, 0.6V, 0.4V, 0.3V, 0.2V, |
   |
|
|
98
|
Mon Aug 4 16:45:43 2025 |
Selin | Boron-3 Consistency Check | These are the consistency checks done for
Boron-3 sample.
Please note that the back strips |
   |
|
|
97
|
Mon Aug 4 16:44:06 2025 |
Selin | Boron-1 Consistency Check | These are the consistency checks done for
Boron-1 sample. |
   |
|
|
96
|
Mon Aug 4 16:32:56 2025 |
Selin | Lithium Consistency Check | These are the consistency checks done for
Lithium sample.
Please note that in the earlier |
   |
|
|
95
|
Mon Jul 21 10:30:01 2025 |
Selin | The 2D Energy Spectrum of Ca41 | The 2D energy spectrum of Ca41 (36 runs). The
expected alpha energies are 4.8 MeV (alpha_0)
and 2.7 MeV (alpha_1). |
|