AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Last 128 days  ELOG logo
  ID Date Author Subject Text Attachments
  105   Wed Sep 24 21:35:27 2025 Emmanuel26AL New processing routine with FFT   29x 
  104   Thu Sep 18 14:11:29 2025 CLW, EONew processing Comparison strip 6 amplitude spectra anew
(red) vs (old) processing (Screenshot). Slight
shift in amplitude and slightly less counts
 Screenshot_2025-09-18_at_12.27.35.pngnewprocessing.pdf 
  103   Tue Sep 9 13:59:29 2025 SelinUserInputs for ProcessingThis is the UserINputs for the processing
of Ca41. The dead time used for the processing
has been 2us. Further processing of a B run
 UserInput_Silicons_Ca41.h 
  102   Mon Aug 25 10:47:44 2025 SelinPulser Test - Week 1 and 2This is the pulser test between runs 221376
and 221377 (06/08/2025) which is in pink
and 221439 and 221440 (13/08/2025) which
 pulserfront6.pdfpulserfront14.pdfpulserback27.pdfpulserback30.pdf 
  101   Thu Aug 21 16:19:43 2025 EmmanuelChecking DEED 11 with the PulserWe checked DEED 11 with the Pulser and
it was still unresponsive (See screenshot).

Next, we will change the LEMO cables
 DEED11_Pulser.png 
  100   Mon Aug 18 09:19:27 2025 EmmanuelDEED 11 NO Gamma Flash SignalWe observed that DEED11 no longer have
Gamma flash signals.

Before the drop, it had some weird
 DEED11_18AUG2025_C.pngDEED11_17AUG2025_B.pngDEED11_17AUG2025_D.pngDEED11_17AUG2025.pngDEED11_18AUG2025.png 
ELOG V3.1.3-7933898