AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 436     Entry time: Tue Nov 8 15:10:16 2016
Author: CG, TD, DK, OH 
Subject: NP1412 R5 R6 
00.15 Setting changed to 71,72,73Ni. All variable degraders in.
      Will remove while watching rates to settle on degrader setting.
      F5 CH2 in. F7 CH2 out. F11 C target in.
      F11 plastic rate 1.2kHz.
      R5 started.
      
00.30 Cut F2 momentum slit. F11 plastic rate down to ~400cps.

00.34 Increased primary beam intensity by x2.
      F11 plastic rate increased to ~800cps.
      This setting should run until the beam change ~03.00.
      
00.47 R6 started.
      All degraders gradually removed but implant rate in DSSD1 only ~10s Hz.

01.03 71,72,73Ni beam stopped for tuning to next setting.
      R6 stopped.
      Leakage currents attachments 1+2
Attachment 1: bias1.png  12 kB  Uploaded Tue Nov 8 16:19:19 2016  | Hide | Hide all
bias1.png
Attachment 2: bias2.png  12 kB  Uploaded Tue Nov 8 16:19:19 2016  | Hide | Hide all
bias2.png
ELOG V3.1.4-unknown