00.15 Setting changed to 71,72,73Ni. All variable degraders in.
Will remove while watching rates to settle on degrader setting.
F5 CH2 in. F7 CH2 out. F11 C target in.
F11 plastic rate 1.2kHz.
R5 started.
00.30 Cut F2 momentum slit. F11 plastic rate down to ~400cps.
00.34 Increased primary beam intensity by x2.
F11 plastic rate increased to ~800cps.
This setting should run until the beam change ~03.00.
00.47 R6 started.
All degraders gradually removed but implant rate in DSSD1 only ~10s Hz.
01.03 71,72,73Ni beam stopped for tuning to next setting.
R6 stopped.
Leakage currents attachments 1+2 |