AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 451     Entry time: Thu Nov 10 12:02:24 2016
Author: TD, OH, CG 
Subject: Thursday 10 November 
21.17 DAQ starts (R30)

      Pulser walkthrough
      Amplitude 90,000 - 10,000 @ 10,000 step
      x5 attenuator IN
      t_r 50ns tau_d 50us
      polarity -, tail pulse, delay MIN
      frequency 250Hz range

21.30 DAQ stops OK 

21.32 DAQ starts (R31)

      Pulser walkthrough
      Amplitude 10,000 - 2,000 @ 2,000 step

21.40 DAQ stops OK

21.44 DAQ starts (R32)
     
      Background
      BNC PB-4 pulser OFF

21.59 DAQ stops OK

23.45 Started R35 so Jorge can do some tests.
      No storage mode.

00.20 Carried out manual fill on LN2 in advance of beam arriving later (~03.00).
      Took around 20mins.
      Continued writing to R35 after soft reset of DAQ.
Attachment 1: 30.png  134 kB  | Hide | Hide all
30.png
Attachment 2: 31.png  142 kB  | Hide | Hide all
31.png
Attachment 3: 32.png  137 kB  | Hide | Hide all
32.png
Attachment 4: 34.png  136 kB  | Hide | Hide all
34.png
ELOG V3.1.4-unknown