14.15 BigRIPS run number is now 1029

15.22 BigRIPS run number is now 1030

15.36 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachment 3

      DAQ continues (RIBF03R1/R20)

      Degrader 3mm Pb fixed + (0.3mm W/1mm Al + 0.5mm W/1mm Al) variable
      
      ASIC settings 2016Nov17-10.50.10

      BNC PB-4 settings 
      Amplitude 90,000
      x5 attenuator IN
      freq 25Hz range
      t_r 50ns, tau_d 50us
      polarity -, int ref, delay MIN, tail pulse

15.43 System-wide checks OK *except* clock status errors from amongst nnaida5, 7, 8, 15 & 16 - bit 2 always set

15.46 Visual scalers - see attachment 4

16.04 Accelerator group wants to change the carbon stripper foil -- beam stop
      Run stop (R20_27 at the end)

16.10 Ambient temperature +25.2 deg C, d.p. +2.6 deg C, RH 23.8%

16.17 BigRIPS run 1031 is junk

16:17 Added 1 mm Al plate to the front of the 3 mm Pb degrader (on the upstream side of PE wall)
      Pb bricks stacked between MUSIC1 and MUSIC2.  
        Not enough time to measure it because of quick foil change
        Basically, about 10 cm thick, and it has a ~7 cm +/- 1 mm window in X, and no cut in Y (it is above and
below MUSIC window)

16:19 Start AIDA run R21.  BRIKEN run started.  BRIKEN Sync issued.

16.22 BigRIPS run 1032

16.26 SyncCheck - see attachment 5

17:01 AIDA merger stopped.  When attempting to stop the Run, the following error is issued:

STATE for nnaida1 returned with an error
error: SOAP http transport timed out after 20000 ms
NONE
error: SOAP http transport timed out after 20000 ms
    while executing
"$transport $procVarName $url $req"
    (procedure "::SOAP::invoke" line 18)
    invoked from within
"::SOAP::invoke ::SOAP::_DataAcquisitionControlClient__GetState"
    ("eval" body line 1)
    invoked from within
"eval ::SOAP::invoke ::SOAP::_DataAcquisitionControlClient__GetState $args"
    (procedure "DataAcquisitionControlClient__GetState" line 1)
    invoked from within
"DataAcquisitionControlClient__GetState"


Going through hardware checks, the check sync errors since baseline gets 23/24 failures  (nnaida6 is still my friend)
      Perform TimeStamp RESYNC -> all can pass the check

17:17 AIDA looks happy now.  R22 started.  

18.16 System-wide checks OK *except* clock status errors from amongst nnaida5, 7, 8, 15 & 16 - bit 2 always set
      and ADC calibration fails nnaida13

18.27 DAQ stops OK
      Soft reset following LN2 refill cycle

18.33 BigRIPS 1034

18.56 DAQ starts (RIBF03R1/R23)

      Degrader (3mm Pb + 1mm Al) fixed + (0.3mm W/1mm Al + 0.5mm W/1mm Al) variable
      
      ASIC settings 2016Nov17-10.50.10

      BNC PB-4 settings 
      Amplitude 90,000
      x5 attenuator IN
      freq 25Hz range
      t_r 50ns, tau_d 50us

19.02 BRIKEN issue correlation scaler reset request
      SyncCheck OK - see attachment 6

      Visual scaler, 1.8.L & 1.8.W spectra, good events stats - see attachments 7-12

1.8.L pulser peak widths

Peak width =    66.76+/-  0.7221
Peak width =   178.72+/-  2.5140
Peak width =    75.37+/-  0.9037
Peak width =    76.21+/-  0.6630
Peak width =    70.19+/-  0.6772
Peak width =    66.65+/-  0.8516
Peak width =    91.90+/-  0.8132
Peak width =    69.90+/-  1.169
Peak width =    73.73+/-  0.6390
Peak width =    73.01+/-  0.7860
Peak width =    81.35+/-  0.7306
Peak width =    84.03+/-  0.8589

Peak width =    77.27+/-  1.2263
Peak width =    78.92+/-  1.2343
Peak width =    76.99+/-  1.1963
Peak width =    68.85+/-  1.7060
Peak width =    82.37+/-  1.2500
Peak width =    84.83+/-  1.3169
Peak width =    90.84+/-  1.4190
Peak width =    89.81+/-  1.3821
Peak width =   100.33+/-  1.6409
Peak width =    89.42+/-  1.4682
Peak width =    97.52+/-  1.5855
Peak width =    64.02+/-  1.0206

19.19 DAQ stops 
      LN2 refill transient?

19.28 soft reset
      DAQ starts (RIBF03R1/R24)

      Degrader (3mm Pb + 1mm Al) fixed + (0.3mm W/1mm Al + 0.5mm W/1mm Al) variable
      
      ASIC settings 2016Nov17-10.50.10

      BNC PB-4 settings 
      Amplitude 90,000
      x5 attenuator IN
      freq 25Hz range
      t_r 50ns, tau_d 50us

19.34 BigRIPS file 1035

19.50 R24_3 AIDA ADC & disc data synchronised - see attachments 13 & 14

21:11 BRIKEN DAQ was not working properly from the last ~half hour (unrelated to AIDA), and had to be restarted and we
also had to send a couple of synchronization pulses.

      R25_0: Started new run once BRIKEN was running and all DAQs synchronized

21.41 BigRIPS file 1037

22.14 Stop DAQ to change degrader

22.16 DAQ starts (RIBF03R1/R26)

      Degrader (3mm Pb + 1mm Al) fixed + (0.3mm W/1mm Al + 1.0mm W/1mm Al) variable
      
      ASIC settings 2016Nov17-10.50.10

      BNC PB-4 settings 
      Amplitude 90,000
      x5 attenuator IN
      freq 25Hz range
      t_r 50ns, tau_d 50us

22.36 BRIKEN DAQ restarted
      re-sync issued
      AIDA data file R26_3
      BRIKEN data file 039

22.42 BigRIPS file 1038
      AIDA data file R26_4
Attachment 1: 1.png  12 kB  | Hide | Hide all
1.png
Attachment 2: 2.png  12 kB  | Hide | Hide all
2.png
Attachment 3: 3.png  136 kB  | Hide | Hide all
3.png
Attachment 4: 4.png  647 kB  | Hide | Hide all
4.png
Attachment 5: 56.png  31 kB  | Hide | Hide all
56.png
Attachment 6: 18.png  40 kB  Uploaded Sun Nov 27 10:04:10 2016  | Hide | Hide all
18.png
Attachment 7: 1.png  635 kB  Uploaded Sun Nov 27 10:08:22 2016  | Hide | Hide all
1.png
Attachment 8: 2.png  161 kB  Uploaded Sun Nov 27 10:08:22 2016  | Hide | Hide all
2.png
Attachment 9: 3.png  167 kB  Uploaded Sun Nov 27 10:08:22 2016  | Hide | Hide all
3.png
Attachment 10: 4.png  151 kB  Uploaded Sun Nov 27 10:08:22 2016  | Hide | Hide all
4.png
Attachment 11: 5.png  90 kB  Uploaded Sun Nov 27 10:08:22 2016  | Hide | Hide all
5.png
Attachment 12: 7.png  142 kB  Uploaded Sun Nov 27 10:36:27 2016  | Hide | Hide all
7.png
Attachment 13: 10.png  86 kB  Uploaded Sun Nov 27 10:58:13 2016  | Hide | Hide all
10.png
Attachment 14: 11.png  36 kB  Uploaded Sun Nov 27 10:58:13 2016  | Hide | Hide all
11.png
ELOG V3.1.4-unknown