00:12 BigRips started run 0223 (Started at 00:12)
AIDA file R20_344
System wide checks all ok
BRIKEN start run 67
01.38 Beam stopped to F11. ~1/2 way through R20_364.
01.43 Beam returned to F11. 1GB through R20_366.
BigRIPS file 0224.
BRIKEN run 68.
System-wise checks all ok, except nnaida1 global clocks failed 6.
Temps ok. Leakage currents ok (see attachment 1).
02.43 BigRIPS started run 0225. Start of R20_381
02.48 BRIKEN run 69 started. Start of R20_382.
03.28 System-wide checks same as previous. (R20_391)
03.43 BigRIPS file 0226. ~1/2 way through R20_394
03.48 BRIKEN run 70 started.
04.46 BigRIPS file 0227 started. End of R20_410.
04.48 BRIKEN run 71 started. Start of R20_411.
05.31 36Ne setting is over. End of R20_421.
BigRIPS team is changing setting for calibration. No beam will go through Zerodegree
05.51 R20 stopped (I was getting food).
06.30 20mm Al degrader + 3mm plastic removed from F8. 23mm Al degrader placed at F11 after IC.
06.35 BigRIPS file 0237 started - 38Mg setting.
06.37 R21 started on 38Mg setting.
06.57 Beam stopped to F11 - accelerator problem.
~700MB into R21_5.
Returned shortly after.
07.23 BigRIPS file 0245 started. ~3/4 way through R21_10.
07.26 BigRIPS file 0246 started. ~1/2 way through R21_11.
07.32 BigRIPS file 0247 started. Start of R21_13.
07.34 BigRIPS file 0248 started. ~1/2 way through R21_13.
07.38 BigRIPS file 0249 started. ~1GB into R21_15.
07.40 BigRIPS file 0250 started. Start of R21_16.
07.41 BigRIPS file 0251 started. Little way through R21_16.
08.06 38Mg setting finished. R21 stopped.
08.08 R22 started - got a bit trigger happy with the DAQ. No beam to F11.
08.10 Degrader set to 10mm Al.
08.16 BigRIPS file 0252 started on 39Al setting.
08.17 R23 started on 39Al setting.
08.20 R23 ended.
08.26 40Si setting. Too high rate for AIDA so beam won't be sent down ZDS.
08.40 F11 degrader set to 15mm Al fixed + 4mm Al variable (all in).
08.43 2nd run at 39Al setting.
BigRIPS file 0254 started.
R24 started.
09.00 R24_4 closed. May have been issues with degrader - not sure we were implanting in AIDA...
End of experiment!
09.07 AIDA background run started - R25.
Pulser is on in the run though.
09.20 R25 ended.
BigRIPS run summary attached. |
|
|
|
|
Attachment 3: |
BigRIPSlog
115 kB
Uploaded Sun Apr 2 02:20:28 2017
| |
|
|