AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 601     Entry time: Fri May 26 02:20:42 2017
Author: CB, OH, NN 
Subject: Friday 26 May 
10.20 DAQ continues OK 
      Current file May2017/R27_22

      Detector biases; leakage currents OK - see attachment 1
      FEE64 Temperatures OK - see attachment 2
      good events; statistics OK - see attachment 3
      No warnings/errors reported by merger since DAQ GO - see attachment 4

      *all* system wide checks OK *except* ADC calibration of nnaida1, 21 and nnaida1 clock status (=6)

10.30 E17/F11 ambient temperature +24.2 deg C, RH 39.7%, d.p. +9.7 deg C
      Julabo FL11006 set point +20 deg C, actual +20.0 deg C, water level OK (c. 75%)

      Left DAQ running on alpha background calibration run
      
      ttyUSB7 log (nnaida1) attached
      GUI got stuck while attempting to drag-and-drop ttyUSB7 to ELOG to upload. Terminal still working and
confirmed Merger working OK.
      Killed nautilus process to get GUI unstuck. Uploaded ttyUS7 via Browse -> Upload button on ELOG instead.

15.51 DAQ continues OK 
      Current file May2017/R27_28

      Detector biases; leakage currents OK - see attachment 6
      FEE64 Temperatures OK - see attachment 7
      good events; statistics OK - see attachment 8
      No warnings/errors reported by merger since DAQ GO - see attachment 9

      *all* system wide checks OK *except* ADC calibration of nnaida1, 21 and nnaida1 clock status (=6)

15.53 E17/F11 ambient temperature +24.1 deg C, RH 40.1%, d.p. +9.8 deg C
      Julabo FL11006 set point +20 deg C, actual +20.0 deg C, water level OK (c. 75%)

      Left DAQ running on alpha background calibration run
      
      ttyUSB7 log (nnaida1) attached

19.20 DAQ continues OK 
      Current file May2017/R27_31

      Detector biases; leakage currents OK - see attachment 11 & 12
      FEE64 Temperatures OK - see attachment 13
      good events; statistics OK - see attachment 14
      No warnings/errors reported by merger since DAQ GO - see attachment 15

      *all* system wide checks OK *except* ADC calibration of nnaida1, 21 and nnaida1 clock status (status=6)

19.30 E17/F11 ambient temperature +24.2 deg C, RH 38.5%, d.p. +9.2 deg C
Attachment 1: 1.png  19 kB  Uploaded Fri May 26 03:24:44 2017  | Hide | Hide all | Show all
1.png
Attachment 2: 2.png  135 kB  Uploaded Fri May 26 03:24:44 2017  | Hide | Hide all | Show all
2.png
Attachment 3: 3.png  90 kB  Uploaded Fri May 26 03:24:44 2017  | Hide | Hide all | Show all
3.png
Attachment 4: 4.png  310 kB  Uploaded Fri May 26 03:24:44 2017  | Hide | Hide all | Show all
4.png
Attachment 5: ttyUSB7  268 kB  Uploaded Fri May 26 03:36:42 2017  | Show | Hide all | Show all
Attachment 6: 1.png  37 kB  Uploaded Fri May 26 08:53:11 2017  | Hide | Hide all | Show all
1.png
Attachment 7: 2.png  135 kB  Uploaded Fri May 26 08:53:11 2017  | Hide | Hide all | Show all
2.png
Attachment 8: 3.png  90 kB  Uploaded Fri May 26 08:53:11 2017  | Hide | Hide all | Show all
3.png
Attachment 9: 4.png  301 kB  Uploaded Fri May 26 08:53:11 2017  | Hide | Hide all | Show all
4.png
Attachment 10: ttyUSB7  268 kB  Uploaded Fri May 26 09:01:47 2017  | Show | Hide all | Show all
Attachment 11: 1.png  12 kB  Uploaded Fri May 26 12:22:28 2017  | Hide | Hide all | Show all
1.png
Attachment 12: 2.png  12 kB  Uploaded Fri May 26 12:22:28 2017  | Hide | Hide all | Show all
2.png
Attachment 13: 3.png  136 kB  Uploaded Fri May 26 12:22:28 2017  | Hide | Hide all | Show all
3.png
Attachment 14: 4.png  90 kB  Uploaded Fri May 26 12:22:28 2017  | Hide | Hide all | Show all
4.png
Attachment 15: 5.png  310 kB  Uploaded Fri May 26 12:22:28 2017  | Hide | Hide all | Show all
5.png
ELOG V3.1.4-unknown