|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
AIDA |
 |
|
Message ID: 623
Entry time: Fri Jun 2 00:01:48 2017
|
Author: |
OH, PW, CB |
Subject: |
Friday 2 June 08:00-16:00 |
|
|
08:05 Briken and BigRIPS stopping daqs
AIDA on file R1_1099
08:07 BigRIPS starts run 1088
BRIKEN starts run 77
08:13 System wide checks all ok
FEE temperatures all ok - attachment 1
Good events statistics - attachment 2
08:50 Bias and leakage currents ok - attachment 3
09:04 BigRIPS and BRIKEN stop daqs
AIDA on file R1_1113
09:05 BigRIPS starts run 1089
BRIKEN starts run 78
AIDA on file R1_1113
09:22 Beam lost AIDA on file R1_1117
09:26 Beam back AIDA on file R1_1118
10:06 BigRIPS and BRIKEN stop daqs
AIDA on file R1_1128
10:07 BigRIPS starts run 1090
BRIKEN starts run 79
AIDA on file R1_1128
10:12 System wide checks ok
10:24 DSSD rates from R1_1131
*** DSSSD # 1 count: 88384 old count: 45978 dt: 1.01 s LEC rate: 42084.25 Hz
*** DSSSD # 2 count: 119845 old count: 62135 dt: 1.01 s LEC rate: 57272.13 Hz
*** DSSSD # 3 count: 40809 old count: 21150 dt: 1.01 s LEC rate: 19509.84 Hz
*** DSSSD # 4 count: 37059 old count: 18986 dt: 1.01 s LEC rate: 17935.87 Hz
*** DSSSD # 5 count: 14947 old count: 7772 dt: 1.01 s LEC rate: 7120.56 Hz
*** DSSSD # 6 count: 29809 old count: 15349 dt: 1.01 s LEC rate: 14350.29 Hz
*** DSSSD # 1 count: 35 old count: 16 dt: 1.01 s HEC rate: 18.86 Hz
*** DSSSD # 2 count: 108 old count: 56 dt: 1.01 s HEC rate: 51.61 Hz
*** DSSSD # 3 count: 77 old count: 38 dt: 1.01 s HEC rate: 38.70 Hz
*** DSSSD # 4 count: 76 old count: 35 dt: 1.01 s HEC rate: 40.69 Hz
*** DSSSD # 5 count: 27 old count: 15 dt: 1.01 s HEC rate: 11.91 Hz
*** DSSSD # 6 count: 4 old count: 2 dt: 1.01 s HEC rate: 1.98 Hz
11:07 BigRIPS and BRIKEN stop their daqs
AIDA on file R1_1142
11:08 BigRIPS starts run 1091
BRIKEN starts run 80
AIDA on file R1_1142
11:10 Leakages and biases ok - attachment 4
11.36 DAQ continues OK
Attached HEC x vs y - attach 5
Zero'd HEC x vs y
11.59 Analysed R1_1153 - see attachment 6
No timewarps
Dead time negligible
All OK
12:06 BigRIPS and BRIKEN stop their daqs
AIDA on file R1_1156
12:07 BigRIPS starts run1092
BRIKEN starts run 81
AIDA on file R1_1156
13:07 BigRIPS and BRIKEN stop daqs
AIDA on file R1_1170
13:08 BRIKEN starts run 82
BigRIPS starts run 1093
AIDA on file R1_1170
13:11 System wide checks ok
13:55 BRIKEN and BigRIPS stop their daqs
AIDA on file R1_1181
Beam gone
14:11 Bias and leakage currents ok - attachment 7
Ambient Temperature 23.9C - Humidity 37.3% - D.P +8.3
15:26 Beam is back
AIDA on file R1_1201
15:07 BigRIPS starts run 1094
BRIKEN starts run 83
AIDA on file R1_1201
15:34 System wide checks ok
FEE temperatures ok - attachment 8
Good Events statistics - attachment 9
15:39 No beam - beam back
15:46 Beam gone for couple of minutes
15:50 Beam back |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|