AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 655     Entry time: Sun Jun 11 08:23:23 2017
Author: PV 
Subject: Sunday 11 June 16:00-00:00  
16:40 beam lost - stripper foil problem
      AIDA file RIBF128/R9_55

16:45 beam is back
      AIDA file R9_57


17:19 BRIKEN and BigRIPS stop DAQs
      AIDA on file R9_66

17:21 BigRIPS starts run 4024
      BRIKEN starts run 134
      AIDA on file R9_67

17:24 beam lost
      AIDA on file R9_68

17:50 beam is still off
      BRIKEN and BigRIPS stop DAQs
      AIDA on file R9_74

17.52 Detector biases & leakage currents OK - see attachments 1
      FEE64 Temperatures OK - see attachment 2
      good events statistics stable (nnaida13 still ~140k) - see attachment 3
      Merger and Tape server OK - see attachment 4,5

      *all* system wide checks OK except ADC calibration for nnaida13


18:00 beam is back
      BRIKEN starts run 135
      BigRIPS starts run 4025
      AIDA on file R9_76

18:05 analysis of file RIBF128/R9_77 no timewarps, 6 MBS timewarps  ~1% dead time on nnaida13 - attachment 6

18:15 beam lost. RF is down.
      AIDA on file R9_80

18:19 beam is back
      AIDA on file R9_82

19:04 BRIKEN and BigRIPS stop DAQs
      AIDA on file R9_93

19:05 BigRIPS starts run 4026
      BRIKEN starts run 136
      AIDA on file R9_94

19:40 analysis of file RIBF128/R9_102 no timewarps, 1 MBS timewarps - attachment 7 

19:44 online high energy hit pattern - attachment 8
      AIDA on file R9_104
      zeroed Midas sort online histogram

19.50 Detector biases & leakage currents OK - see attachments 9
      FEE64 Temperatures OK - see attachment 10
      good events statistics stable - see attachment 11
      Merger and Tape server OK - see attachment 12, 13

      *all* system wide checks OK except ADC calibration for nnaida13

20:05 BRIKEN and BigRIPS stop DAQs
      AIDA on file R9_110

20:07 BigRIPS starts run 4027
      BRIKEN starts run 137
      AIDA on file R9_111

20:11 Accelerator people stop the beam to fix the stripper system for about 30 min.
      BRIKEN and BigRIPS stop DAQs
      AIDA on file R9_112

21:12 Beam is back
      AIDA on file R9_127

21:12 BigRIPS starts run 4028
      BRIKEN starts run 138
      AIDA on file R9_127

21:21 offline analysis RIBF128/R9_128 rates
 *** DSSSD # 1 count:    469757 old count:    409726 dt:      1.01 s  LEC rate:  59182.53 Hz
 *** DSSSD # 2 count:    688773 old count:    600379 dt:      1.01 s  LEC rate:  87144.65 Hz
 *** DSSSD # 3 count:    226922 old count:    196673 dt:      1.01 s  LEC rate:  29821.47 Hz
 *** DSSSD # 4 count:    197996 old count:    173086 dt:      1.01 s  LEC rate:  24557.93 Hz
 *** DSSSD # 5 count:     75519 old count:     66217 dt:      1.01 s  LEC rate:   9170.53 Hz
 *** DSSSD # 6 count:    161720 old count:    141631 dt:      1.01 s  LEC rate:  19805.07 Hz
 *** DSSSD # 1 count:         6 old count:         6 dt:      1.01 s  HEC rate:      0.00 Hz
 *** DSSSD # 2 count:       212 old count:       179 dt:      1.01 s  HEC rate:     32.53 Hz
 *** DSSSD # 3 count:        54 old count:        49 dt:      1.01 s  HEC rate:      4.93 Hz
 *** DSSSD # 4 count:        20 old count:        16 dt:      1.01 s  HEC rate:      3.94 Hz
 *** DSSSD # 5 count:        43 old count:        37 dt:      1.01 s  HEC rate:      5.92 Hz
 *** DSSSD # 6 count:       117 old count:       105 dt:      1.01 s  HEC rate:     11.83 Hz

zeroed Midas sort histograms

21:38 beam lost due to stripper problem
      AIDA on file R9_134

21:41 analysis of file RIBF128/R9_134 no timewarps, no MBS timewarps - attachment 14

20:05 BRIKEN and BigRIPS stop DAQs
      AIDA on file R9_138
     
22.00 Detector biases & leakage currents OK - see attachments 15
      FEE64 Temperatures OK - see attachment 16
      good events statistics OK (no beam now) - see attachment 17
      Merger and Tape server OK - see attachment 18, 19

      *all* system wide checks OK except ADC calibration for nnaida13    

22:09 beam is back
      BigRIPS starts run 4029
      BRIKEN starts run 139
      AIDA on file R9_142

22:42 online implantation profile - attachment 20
      AIDA on file R9_151
      zeroed Midas sort online histograms

23:10 BRIKEN and BigRIPS stop DAQs
      AIDA on file R9_159

23:11 BigRIPS starts run 4030
      BRIKEN starts run 140
      AIDA on file R9_159

23:37 analysis of file RIBF128/R9_165 no timewarps, 2 MBS timewarps - attachment 21
Attachment 1: bias1752.png  19 kB  Uploaded Sun Jun 11 11:01:38 2017  | Hide | Hide all | Show all
bias1752.png
Attachment 2: temp1752.png  135 kB  Uploaded Sun Jun 11 11:01:44 2017  | Hide | Hide all | Show all
temp1752.png
Attachment 3: stat1752.png  90 kB  Uploaded Sun Jun 11 11:01:51 2017  | Hide | Hide all | Show all
stat1752.png
Attachment 4: merger1752.png  296 kB  Uploaded Sun Jun 11 11:02:07 2017  | Hide | Hide all | Show all
merger1752.png
Attachment 5: tapes1752.png  100 kB  Uploaded Sun Jun 11 11:02:14 2017  | Hide | Hide all | Show all
tapes1752.png
Attachment 6: R9_77.txt  11 kB  Uploaded Sun Jun 11 11:07:38 2017  | Show | Hide all | Show all
Attachment 7: R9_102.txt  10 kB  Uploaded Sun Jun 11 12:44:05 2017  | Show | Hide all | Show all
Attachment 8: hitpatt1944.png  58 kB  Uploaded Sun Jun 11 12:46:00 2017  | Hide | Hide all | Show all
hitpatt1944.png
Attachment 9: bias1950.png  22 kB  Uploaded Sun Jun 11 12:52:33 2017  | Hide | Hide all | Show all
bias1950.png
Attachment 10: temp1950.png  135 kB  Uploaded Sun Jun 11 12:52:38 2017  | Hide | Hide all | Show all
temp1950.png
Attachment 11: stat1950.png  91 kB  Uploaded Sun Jun 11 12:52:46 2017  | Hide | Hide all | Show all
stat1950.png
Attachment 12: merger1950.png  296 kB  Uploaded Sun Jun 11 12:52:53 2017  | Hide | Hide all | Show all
merger1950.png
Attachment 13: tapes1950.png  101 kB  Uploaded Sun Jun 11 12:53:00 2017  | Hide | Hide all | Show all
tapes1950.png
Attachment 14: R9_134.txt  10 kB  Uploaded Sun Jun 11 14:43:03 2017  | Show | Hide all | Show all
Attachment 15: bias2200.png  21 kB  Uploaded Sun Jun 11 15:03:02 2017  | Hide | Hide all | Show all
bias2200.png
Attachment 16: temp2200.png  135 kB  Uploaded Sun Jun 11 15:03:08 2017  | Hide | Hide all | Show all
temp2200.png
Attachment 17: stat2200.png  91 kB  Uploaded Sun Jun 11 15:03:14 2017  | Hide | Hide all | Show all
stat2200.png
Attachment 18: merger2153.png  296 kB  Uploaded Sun Jun 11 15:03:21 2017  | Hide | Hide all | Show all
merger2153.png
Attachment 19: tapes2200.png  100 kB  Uploaded Sun Jun 11 15:03:27 2017  | Hide | Hide all | Show all
tapes2200.png
Attachment 20: hitpattern2242.png  54 kB  Uploaded Sun Jun 11 15:44:39 2017  | Hide | Hide all | Show all
hitpattern2242.png
Attachment 21: R9_165.txt  11 kB  Uploaded Sun Jun 11 16:38:49 2017  | Show | Hide all | Show all
ELOG V3.1.4-unknown