AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 656     Entry time: Sun Jun 11 16:04:12 2017
Author: DK 
Subject: Monday 12 June 0:00 ~ 8:00 
0:04    Biases and leak currents shown as attachment #1, 12JunBias1.png
        System-wide checks: nnaida13 fails ADC calib, all others okay
        Temperatures shown as attachment #2, 12JunTemp1.png
        Implants are 20 to 40 cps, mostly in SSD2 and SSD6 see attachment #3 12JunImplant1.png
        Statistics shown attachment #4, 12JunStats1.png
        Analysis shown as R9_175.txt attachment #5
        

00:17   No implants in AIDA nor proper evt. numbers in BRIKEN R9_177, expect beam is down
        Operators call, RF dropped of IRC

00:23   Problem of another RF.

00:24   Beam is back R9_179 for AIDA

00:36   AIDA R9_182 at run close.

00:39   AIDA R9_183, BRIKEN 141, run BigRIPS 4031

00:50   We stop the beam to adjust degraders in F11.  AIDA R9_186
        BRIKEN and BigRIPS runs stopped

00:54   Removed 1.0 mm Al, added 0.5 mm (net is subtracting 0.5 mm Al)
        R9_187 AIDA run, BRIKEN #142, BigRIPS #4032

01:34   AIDA R9_198 at changeover

01:35   Same AIDA run R9_198, BRIKEN #143, BigRIPS #4033
        System wide checks okay (except ADC calib on nnaida13)

02:34   R9_214 at changeover.  

2:36    R9_215 with new runs BRIKEN 144 and BigRIPS 4034.
        More implants are now seen in SSD3 rather than SSD2.  Zeroed MIDAS histos, so updated later with stats.
        Biases as attachment #6, 12JunBiases2.png

02:45  Beam stopped R9_217.  Beam stripper has a problem.

02:48  Beam is back, R9_220

03:12  R9_224 operators call, beam is stopped from stripper foil issue

03:18  Beam is back, AIDA run R9_226

03:34  R9_230 at changeover
       System wide checks all okay, except nnaida13 ADC calib as above.

03:35  The end of R9_230 corresponds with BRIKEN 145 and BigRIPS 4034.

03:51  Operators call, beam looks stopped.  R9_235 at AIDA.  Change stripper foil

03:57  R9_236 when beam returns.

04:35  We noticed beam is gone.  R9_246 for AIDA.  

04:36  Beam comes back.  R9_247 BRIKEN 146 and BigRIPS 4035
       Attachment #7 12JunImplant2.png shows implantation profile, confirming SSD 3 is the main one with new
degrader setting
       Statistics shown as attachment #8, 12JunStats2.png
       Analysis shown as attachment #9, R9_244.txt
         No ts timewarps, no MBS timewarps, deadtime on nnaida13,21 nearly 1%, most others small.

05:20  Noticed /data10 only has ~250 GB left, so we should do something to resolve it.
       First thing is, not much compression is done recently.  So I begin to compress /TapeData/RIBF128/R7* with
nice 10
       However, compression at this rate will take much too long so it looks like something should be removed.
       Confirmed that RIBF127R1 data file names and sizes are the same between /TapeData and the new external HDD
at /ntfs

05:33  AIDA R9_262, BRIKEN 147, BigRIPS 4036

06:34  AIDA R9_279 at run change

06:36  BRIKEN run 148, BigRIPS 4037
       System-wide checks passed, except nnaida13 ADC calib still fails.

06:54  R9_284 beam is stopped.

6:59   Beam is back.

07:33  R9_295 at start of BRIKEN 149, BigRIPS 4037

07:36  No syncs are seen at BRIKEN (but they were seen at the start of other runs)
       Implant profiles shown as Attachment #10, 12JunImplants3.png
       Several resets or new runs on BRIKEN / BigRIPS are done to troubleshoot

07:48  AIDA passes all system checks (besides the nnaida13 ADC calib)
       It seems (part of) the issue is triggers from BigRIPS.

08:04  BigRIPS scalers show events are presented, but no triggers are accepted.
       Some part of the DAQ is vetoing the events basically.

08:11  Baba san came on shift.  Issue was ccnet03 crashed.  We reset the Camac crate and reinitialized, DAQ comes back
       AIDA R9_306, BRIKEN #152, BigRIPS # 4041
Attachment 1: 12JunBias1.png  21 kB  Uploaded Sun Jun 11 17:05:12 2017  | Show | Show all
Attachment 2: 12JunTemp1.png  104 kB  Uploaded Sun Jun 11 17:09:28 2017  | Show | Show all
Attachment 3: 12JunImplant1.png  201 kB  Uploaded Sun Jun 11 17:15:23 2017  | Show | Show all
Attachment 4: 12JunStats1.png  59 kB  Uploaded Sun Jun 11 17:15:28 2017  | Show | Show all
Attachment 5: R9_175.txt  11 kB  Uploaded Sun Jun 11 17:16:00 2017  | Show | Show all
Attachment 6: 12JunBias2.png  21 kB  Uploaded Sun Jun 11 19:38:56 2017  | Show | Show all
Attachment 7: 12JunImplant2.png  28 kB  Uploaded Sun Jun 11 21:39:03 2017  | Show | Show all
Attachment 8: 12JunStats2.png  58 kB  Uploaded Sun Jun 11 21:40:25 2017  | Show | Show all
Attachment 9: R9_244.txt  11 kB  Uploaded Sun Jun 11 21:41:50 2017  | Show | Show all
Attachment 10: 12JunImplants3.png  31 kB  Uploaded Mon Jun 12 01:06:44 2017  | Show | Show all
ELOG V3.1.4-unknown