AIDA |
 |
|
Message ID: 730
Entry time: Thu Jun 28 05:22:31 2018
|
Author: |
OH |
Subject: |
Analysis of R7 -> R9 |
|
|
R7_0 -> R7_1 High Energy pulser run
R8_0 -> R8_1 Low energy puler run
R9_52 -> R9_62 Alpha run
On analysing all three runs it appears an ASIC is missing in FEE 29 - attachments 1 - 3
This ASIC does not appear to be missing in the alpha run carried out on June 24th - attachment 4
I do not believe that this is a broken ASIC.
I have performed an ASIC check load on the FEE module to try and regain it. I will check the files created since
later to see if it has been regained.
Using the pulser runs two different sets of offsets were calculated. One using the low energy run and one using
the high energy.
To compare the two different sets of offsets calculated Ex vs Ey plots were created for the first detector.
Attachment 5 shows these plots on the left is the low energy offsets and on the right the high energy pulser offsets
It can be seen that the grouping is much better with the events being tighter to the y = x line on the run sorted
using the low energy pulser offsets. |
|
|
|
|
|
|
|
|
|
|