AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 78     Entry time: Wed Apr 29 01:03:41 2015
Author: JA, LHB, TD, AE, CG & VP 
Subject: Wednesday 29 April 2015 
Overnight
      Beam tuning, PID tests - beam stopped in scintilator detector + 1" thick Pb bricks 
      DAQ ran OK (not to disk)
      DSSSD #3 tripped, re-enabled OK 


09.00 AIDA temperatures - attachment 1
      CAEN N1419 HV settings - attachment 2

09.25 Statistics & lost activity - attachments 3-8

10.30 Scintilator detector + 1" thick Pb bricks removed
      ~1KHz 84Zn to Degrader + MICA + Veto + AIDA DSSSDs #1-3 + 10mm Al

      Data file R15 12.15-12.59 beam lost
      Attachments 9-14 DSSSD #1-3 HEC ADC spectra, HEC LLD 0x08

      Attachments 15-16 Examples of Data Readout Control following stalled DAQ GO (no SYNCs) 

      Data file R16 13.02-13.46 SYNCs lost/MERGE stalled
      HEC LLD 0x02

      Data file R17 13.46-14.20

      Data file R19 15.30-17.05

      Data file R20 17.06
      Fast comparator LLD HEC 0x02, LEC 0x20 (except nnaida30 HEC 0x20)

22.14 Data file R22 22.14 - 30.4.15 09.00
      Now using /data20/TapeData/May2015 to store data
      Spectra cleared at start of run
      DAQ OK, CAEN N1419 ch #2 tripped
      

       
Attachment 1: 31.png  110 kB  | Hide | Hide all
31.png
Attachment 2: 32.png  10 kB  | Hide | Hide all
32.png
Attachment 3: 33.png  80 kB  Uploaded Wed Apr 29 02:23:08 2015  | Hide | Hide all
33.png
Attachment 4: 34.png  78 kB  Uploaded Wed Apr 29 02:23:21 2015  | Hide | Hide all
34.png
Attachment 5: 35.png  74 kB  Uploaded Wed Apr 29 02:23:35 2015  | Hide | Hide all
35.png
Attachment 6: 36.png  78 kB  Uploaded Wed Apr 29 02:23:48 2015  | Hide | Hide all
36.png
Attachment 7: 37.png  78 kB  Uploaded Wed Apr 29 02:24:00 2015  | Hide | Hide all
37.png
Attachment 8: 38.png  107 kB  Uploaded Wed Apr 29 02:24:17 2015  | Hide | Hide all
38.png
Attachment 9: 20150429_nnaida1_det3_H.png  150 kB  Uploaded Wed Apr 29 06:20:25 2015  | Hide | Hide all
20150429_nnaida1_det3_H.png
Attachment 10: 20150429_nnaida2_det2_H.png  156 kB  Uploaded Wed Apr 29 06:20:40 2015  | Hide | Hide all
20150429_nnaida2_det2_H.png
Attachment 11: 20150429_nnaida4_det2_H.png  137 kB  Uploaded Wed Apr 29 06:20:54 2015  | Hide | Hide all
20150429_nnaida4_det2_H.png
Attachment 12: 20150429_nnaida8_det3_H.png  153 kB  Uploaded Wed Apr 29 06:21:09 2015  | Hide | Hide all
20150429_nnaida8_det3_H.png
Attachment 13: 20150429_nnaida10_det1_H.png  151 kB  Uploaded Wed Apr 29 06:21:22 2015  | Hide | Hide all
20150429_nnaida10_det1_H.png
Attachment 14: 20150429_nnaida16_det1_H.png  141 kB  Uploaded Wed Apr 29 06:21:39 2015  | Hide | Hide all
20150429_nnaida16_det1_H.png
Attachment 15: 20150429_dataReadout_nnaida4.png  129 kB  Uploaded Wed Apr 29 06:22:08 2015  | Hide | Hide all
20150429_dataReadout_nnaida4.png
Attachment 16: 20150429_datrareadout_nnaida3.png  129 kB  Uploaded Wed Apr 29 06:22:23 2015  | Hide | Hide all
20150429_datrareadout_nnaida3.png
ELOG V3.1.4-unknown