16.10 DAQ continues as before.
Merger rate ~700k items/s and ~5.3Kb/s
Individual FEE rates remain roughly constant
Temps and bias ok.
17.33 DTAS run 149 stopped
DTAS run 150 started
BigRIPS run 2057
AIDA run ~1.3GB in R2_865
19.30 DTAS run 152 stopped
DTAS run 153 started
BigRIPS run 2058
AIDA run ~1.8GB in R2_884
Temps and bias ok.
Rates in merger, tape server and individual FEEs as before.
19.50 In looking at previous data, AIDA is seeing ~30% fewer implants that what is observed at F11Plastic
Beam spot is not central on AIDA and some ions will be lost over sides of DSSD, but does not look
like it would account for a ~30% reduction
AIDA implant profile shown in Attachment 1 - from file
merged_a2_687_708_br190618_2315_100Sn118_121bgrun2049_sw_Tsi.root
21.01 Beam stopped.
DTAS run 155 stopped.
AIDA file R2_899.
DTAS and AIDA will continue with background measurements.
21.04 DTAS run 156 started
AIDA run R2_899
Chiller is full.
Lead bricks upstream of moderator.
That's all folks. |