This is a short list of things todo or check before the test beam time on 11.12.23
Updated after 15:00 CET meeting
1. Replace water interlock
- Also allows testing of AIDA for 24h+
2. Decide on snout configuration: 1 or 2 BB18s (plus BB7 plus bPlastic)
It is U so if we put 2 we could damage 2 instead of just 1 (of course we try to be careful)
To decide which bPlas is installed (only 1 will be bothered): Upstream is preferred by HA
Install Peter's light blocking frame between bPlastic and AIDA
3. Replace aida04 with a working FEE64
Important as aida04 is in deadtime and not very useful
4. Investigate/replace aida06
Less urgent because 2 strips and runs with 0 dead time
5. If 2 BB18s, add another 8 working FEE64s to the system
Note: Cannot do 2BB18s and 1BB7 (cannot power/cool 17 FEEs)
6. Test AIDA firmware fix for individual ASIC controls (especially if BB7<->AIDA will be tested)
BB7<->AIDA will not be tested probably, as PCB will not arrive.
Still good to check if possible
7. Decide on FEE to take pulser (assuming no distribution/inverter available)
Test implant response with pulser and SC41 trigger? |